Files
Atomizer/hq/workspaces/shared/PROJECT_STATUS.md

2.0 KiB

Project Status Dashboard

Updated: 2026-02-20 04:00 AM (Nightly Digestion OP_11)

Active Projects

🔩 Hydrotech Beam — Optimization

  • Phase: DOE Phase 1 complete, awaiting Phase 2 (TPE)
  • Status: ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
  • Key numbers: 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
  • Next: Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
  • Owner: Tech Lead + Study Builder

📐 Atomizer Project Standard

  • Phase: Review complete, awaiting CEO decision
  • Status: 🟡 AWAITING APPROVAL
  • Deliverables ready: Full spec, tech-lead review, auditor audit, secretary synthesis
  • Location: shared/standardization/
  • Key decision: Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
  • Owner: Manager

🔺 Adaptive Isogrid Plate Lightweighting

  • Phase: Technical spec locked, reviews complete
  • Status: 🟡 AWAITING CEO REVIEW
  • Deliverables ready: Full technical spec (32KB), optimizer review, tech-lead review, webster review
  • Location: shared/war-room-isogrid/
  • Architecture: Python Brain + NX Hands + Atomizer Manager (semi-automated isogrid optimization)
  • Next: CEO review → implementation planning
  • Owner: Manager / Tech Lead

🔬 Material Research (M2 Mirror Trade Study)

  • Phase: Research complete
  • Status: Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
  • Next: Awaiting project context to produce recommendation
  • Owner: Webster

Pending Items

  • Auditor blocked on P-Adaptive-Isogrid review (needs Tech Lead response since Feb 16)
  • Secretary TASK-002 delivery failed (Slack token issue) — resolved via TASK-004

Recent Completions (last 7 days)

  • 2026-02-18: Project standardization package assembled and reviewed
  • 2026-02-19: Auditor spec audit completed
  • 2026-02-17: System test orchestration validated (TASK-001 through TASK-004)