chore(hq): daily sync 2026-02-23
This commit is contained in:
@@ -34,3 +34,62 @@
|
||||
|
||||
### SELF-DOCUMENT
|
||||
- No changes needed — docs current
|
||||
|
||||
---
|
||||
|
||||
## AOM Project — MASSIVE Session (afternoon)
|
||||
|
||||
### What Happened
|
||||
Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering:
|
||||
|
||||
1. **AOM Phase 3 completed** — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines).
|
||||
|
||||
2. **Phase 4 (LLM Layer) completed** — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module.
|
||||
|
||||
3. **Phase 5 (Living Protocol) completed** — maintenance rules, update triggers, health checks, ownership model.
|
||||
|
||||
4. **Tool-Agnostic Architecture Plan** — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote `ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure.
|
||||
|
||||
5. **AOM V2 Integration** — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases:
|
||||
- Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference)
|
||||
- Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap)
|
||||
- Phase C: 19 surgical updates across all pillars
|
||||
- Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev)
|
||||
- Phase E: MAP + final updates
|
||||
|
||||
**Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.**
|
||||
|
||||
6. **V2 Migration Master Plan** — Antoine confirmed new repo at `http://192.168.86.50:3000/Antoine/Atomizer-V2` (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy.
|
||||
|
||||
### Key Decisions Made (by Antoine)
|
||||
- DEC-030: Tool-agnostic architecture approved
|
||||
- DEC-032: New repo (V2) instead of cleaning V1
|
||||
- DEC-033: Documentation-first — AOM before code
|
||||
- DEC-021: AOM stays in Obsidian until migration
|
||||
- V2 Gitea repo created at `192.168.86.50:3000/Antoine/Atomizer-V2`
|
||||
|
||||
### CEO Decisions Still Pending (for migration)
|
||||
1. License type (Apache 2.0 / MIT)
|
||||
2. GitHub repo name
|
||||
3. Obsidian ↔ repo sync strategy
|
||||
4. HQ separation (in V2 or separate?)
|
||||
5. Confirm projects/ stays off git
|
||||
6. GitHub visibility (public/private)
|
||||
7. Timing to start
|
||||
|
||||
### Files Created/Modified Today
|
||||
- `P-Atomizer-Operating-Manual/` — 11 new docs, 5 rewrites, 19 updates
|
||||
- `Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB)
|
||||
- `Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md` (28KB)
|
||||
- Integration plan archived to `P-Atomizer-Operating-Manual/Archive/`
|
||||
|
||||
### Blocker: Sub-agent Spawning
|
||||
- `sessions_spawn` fails with "gateway closed (1008): pairing required" — both with `agentId=auditor` and without
|
||||
- This blocks delegating work to Auditor (or any sub-agent)
|
||||
- Asked Antoine for preference: self-review on Opus or wait for infra fix
|
||||
- No response yet as of 7pm
|
||||
|
||||
### Next Steps
|
||||
- Awaiting Antoine's decision on auditor review approach (self vs wait for infra)
|
||||
- Antoine reviewing migration master plan
|
||||
- After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)
|
||||
|
||||
35
hq/workspaces/manager/memory/2026-02-23.md
Normal file
35
hq/workspaces/manager/memory/2026-02-23.md
Normal file
@@ -0,0 +1,35 @@
|
||||
# 2026-02-23
|
||||
|
||||
## Nightly Digestion — OP_11 (Incremental)
|
||||
|
||||
### STORE
|
||||
- **AOM V2 Migration** is the dominant new workstream as of Feb 22. Massive session: AOM completed (48 docs, ~8,830 lines), tool-agnostic architecture approved (DEC-030), V2 repo created at `192.168.86.50:3000/Antoine/Atomizer-V2` (DEC-032), documentation-first approach confirmed (DEC-033).
|
||||
- Auditor delivered V2 migration audit (288 lines) identifying 11 findings including 13 missing V1 modules. Revised masterplan (V2) produced addressing all findings — 12-day realistic timeline.
|
||||
- Code review also delivered (`shared/reviews/v2-migration-code-review.md`, 255 lines).
|
||||
- 6 CEO decisions still pending for V2 migration: license type, GitHub name, sync strategy, HQ separation, projects/ exclusion, visibility, timing.
|
||||
- Sub-agent spawning broken ("gateway closed 1008: pairing required") — blocks delegation. Unresolved.
|
||||
|
||||
### DISCARD
|
||||
- Memory files: oldest is Feb 8 (15 days) — within 30-day retention. No pruning needed.
|
||||
- No contradictions found in current memory.
|
||||
- No stale TODOs resolved since last cycle.
|
||||
|
||||
### SORT
|
||||
- V2 Migration reviews correctly placed in `shared/reviews/` (project-level artifacts).
|
||||
- AOM docs live in Obsidian vault (correct — CEO decision DEC-021).
|
||||
- No patterns to promote from session-level to domain-level.
|
||||
|
||||
### REPAIR
|
||||
- **PROJECT_STATUS.md needs update** — doesn't reflect AOM/V2 Migration project or auditor's V2 audit deliverable. Updating now.
|
||||
- Auditor P-Adaptive-Isogrid block: still unresolved (since Feb 16, now 7 days). Tech Lead has not responded.
|
||||
- Webster web_search API key: still needs Mario (since Feb 19).
|
||||
- Sub-agent spawning: broken since Feb 22 at minimum. Infrastructure issue for Mario.
|
||||
|
||||
### EVOLVE
|
||||
- **Observation:** The Feb 22 session was a solo mega-session (Manager did everything — AOM writing, architecture, migration planning) because sub-agent spawning is broken. This is unsustainable for complex work. Sub-agent infra fix is critical.
|
||||
- **Observation:** 4 projects now awaiting CEO input simultaneously (Hydrotech Beam, Project Standard, Adaptive Isogrid, V2 Migration decisions). Priority triage essential when Antoine returns.
|
||||
- **Process note:** Auditor review via spawned sub-agent DID work on Feb 22 (delivered the V2 audit) — so spawning may be intermittent, not fully broken. Worth retesting.
|
||||
|
||||
### SELF-DOCUMENT
|
||||
- PROJECT_STATUS.md updated to include AOM/V2 Migration project.
|
||||
- No other doc changes needed.
|
||||
Reference in New Issue
Block a user