chore(hq): daily sync 2026-02-24

This commit is contained in:
2026-02-24 10:00:18 +00:00
parent c7ef38282f
commit 2026572d91
17 changed files with 919 additions and 72 deletions

View File

@@ -28,6 +28,8 @@ Read these on first session to fully understand the vision and architecture.
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE. **Blocked on Antoine running updated code on dalidou.**
- **Adaptive Isogrid Plate Lightweighting** — Channel: war-room-isogrid | Phase: Technical spec locked + reviews complete. Full spec (32KB) + optimizer/tech-lead/webster reviews in `shared/war-room-isogrid/`. Architecture: "Python Brain + NX Hands + Atomizer Manager". Next: CEO review → implementation planning.
- **Atomizer Project Standard** — Phase: Full review package delivered (2026-02-18). Spec (~57KB), tech-lead review, auditor audit, secretary synthesis all complete. Files in `shared/standardization/`. **Auditor verdict: spec is over-engineered — recommends Minimum Viable Standard (MVS) based on Hydrotech Beam's existing structure.** Awaiting CEO decision: adopt full spec vs MVS approach. Next: Antoine review → decision → implementation.
- **Atomizer V2 Migration** — Phase: COMPLETE (2026-02-23). 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests, roadmap for items 4-9. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows. V1 tagged `v1-final` but kept active for Antoine's current optimizations. AOM→Obsidian auto-sync via crontab (15min rsync + wiki-link conversion). Phase 6 (archive V1) deferred until Antoine switches production work.
- **Atomizer/HQ Separation** — CEO decision (2026-02-23): Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated to reflect boundary. DEC-037 logged. HQ repo pushed to Gitea with full operational structure (218 files).
## Core Protocols
- **OP_11 — Digestion Protocol** (CEO-approved 2026-02-11): STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT. Runs at phase completion, weekly heartbeat, and project close. Antoine's corrections are ground truth.