chore(hq): daily sync 2026-03-20
This commit is contained in:
@@ -25,11 +25,13 @@ All Atomizer HQ planning docs are in `context-docs/`:
|
||||
Read these on first session to fully understand the vision and architecture.
|
||||
|
||||
## Active Projects
|
||||
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE. **Blocked on Antoine running updated code on dalidou.**
|
||||
- **Adaptive Isogrid Plate Lightweighting** — Channel: war-room-isogrid | Phase: Technical spec locked + reviews complete. Full spec (32KB) + optimizer/tech-lead/webster reviews in `shared/war-room-isogrid/`. Architecture: "Python Brain + NX Hands + Atomizer Manager". Next: CEO review → implementation planning.
|
||||
- **Atomizer Project Standard** — Phase: Full review package delivered (2026-02-18). Spec (~57KB), tech-lead review, auditor audit, secretary synthesis all complete. Files in `shared/standardization/`. **Auditor verdict: spec is over-engineered — recommends Minimum Viable Standard (MVS) based on Hydrotech Beam's existing structure.** Awaiting CEO decision: adopt full spec vs MVS approach. Next: Antoine review → decision → implementation.
|
||||
- **Atomizer V2 Migration** — Phase: COMPLETE (2026-02-23). 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests, roadmap for items 4-9. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows. V1 tagged `v1-final` but kept active for Antoine's current optimizations. AOM→Obsidian auto-sync via crontab (15min rsync + wiki-link conversion). Phase 6 (archive V1) deferred until Antoine switches production work.
|
||||
- **Atomizer/HQ Separation** — CEO decision (2026-02-23): Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated to reflect boundary. DEC-037 logged. HQ repo pushed to Gitea with full operational structure (218 files).
|
||||
- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`.
|
||||
- **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`.
|
||||
- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on GigaBIT M1 now.
|
||||
- **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review.
|
||||
- **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach.
|
||||
- **Atomizer V2 Migration** — ✅ COMPLETE (2026-02-23). V1 tagged `v1-final`, kept active. Phase 6 (archive V1) deferred.
|
||||
- **Atomizer/HQ Separation** — ✅ COMPLETE (2026-02-23). DEC-037 logged.
|
||||
|
||||
## Core Protocols
|
||||
- **OP_11 — Digestion Protocol** (CEO-approved 2026-02-11): STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT. Runs at phase completion, weekly heartbeat, and project close. Antoine's corrections are ground truth.
|
||||
|
||||
Reference in New Issue
Block a user