# Project Status Dashboard
|
||||
Updated: 2026-02-15 10:25 AM
|
||||
Updated: 2026-02-20 04:00 AM (Nightly Digestion OP_11)
|
||||
|
||||
## Active Tasks
|
||||
- **Material Research (Webster):**
|
||||
- [x] Zerodur Class 0 CTE data acknowledged (2026-02-15 10:07)
|
||||
- [x] Ohara Clearceram-Z HS density confirmed: 2.55 g/cm³ (2026-02-15 10:12)
|
||||
- [x] Zerodur Young's Modulus logged: 90.3 GPa (2026-02-15 10:18)
|
||||
## Active Projects
|
||||
|
||||
## Recent Activity
|
||||
- Webster logged Young's Modulus for Zerodur (90.3 GPa) via orchestration hook.
|
||||
- Webster confirmed receipt of orchestration ping.
|
||||
- Webster reported density for Ohara Clearceram-Z HS (2.55 g/cm³).
|
||||
### 🔩 Hydrotech Beam — Optimization
|
||||
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
|
||||
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
|
||||
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
|
||||
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
|
||||
- **Owner:** Tech Lead + Study Builder
|
||||
|
||||
### 📐 Atomizer Project Standard
|
||||
- **Phase:** Review complete, awaiting CEO decision
|
||||
- **Status:** 🟡 AWAITING APPROVAL
|
||||
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
|
||||
- **Location:** `shared/standardization/`
|
||||
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
|
||||
- **Owner:** Manager
|
||||
|
||||
### 🔺 Adaptive Isogrid Plate Lightweighting
|
||||
- **Phase:** Technical spec locked, reviews complete
|
||||
- **Status:** 🟡 AWAITING CEO REVIEW
|
||||
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
|
||||
- **Location:** `shared/war-room-isogrid/`
|
||||
- **Architecture:** Python Brain + NX Hands + Atomizer Manager (semi-automated isogrid optimization)
|
||||
- **Next:** CEO review → implementation planning
|
||||
- **Owner:** Manager / Tech Lead
|
||||
|
||||
### 🔬 Material Research (M2 Mirror Trade Study)
|
||||
- **Phase:** Research complete
|
||||
- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
|
||||
- **Next:** Awaiting project context to produce recommendation
|
||||
- **Owner:** Webster
|
||||
|
||||
## Pending Items
|
||||
- Auditor blocked on P-Adaptive-Isogrid review (needs Tech Lead response since Feb 16)
|
||||
- Secretary TASK-002 delivery failed (Slack token issue) — resolved via TASK-004
|
||||
|
||||
## Recent Completions (last 7 days)
|
||||
- 2026-02-18: Project standardization package assembled and reviewed
|
||||
- 2026-02-19: Auditor spec audit completed
|
||||
- 2026-02-17: System test orchestration validated (TASK-001 through TASK-004)
|
||||
|
||||