chore(hq): daily sync 2026-04-01

This commit is contained in:
2026-04-01 09:00:44 +00:00
parent 4341215af2
commit b45896a391
19 changed files with 127 additions and 327 deletions

View File

@@ -2,8 +2,8 @@
"tasks": [
{
"id": "guide_onboarding",
"title": "\ud83c\udfed Atomizer HQ \u2014 Mission Control",
"description": "Self-hosted dashboard at http://100.68.144.33:8091\n\nAgents update tasks by writing to ~/atomizer/mission-control/data/tasks.json.\nNo GitHub tokens needed \u2014 everything is local.\n\nManaged by: Manager agent\nBacked up to: Gitea (Atomizer-HQ repo)",
"title": "🏭 Atomizer HQ Mission Control",
"description": "Self-hosted dashboard at http://100.68.144.33:8091\n\nAgents update tasks by writing to ~/atomizer/mission-control/data/tasks.json.\nNo GitHub tokens needed everything is local.\n\nManaged by: Manager agent\nBacked up to: Gitea (Atomizer-HQ repo)",
"status": "permanent",
"project": "meta",
"tags": [
@@ -13,7 +13,7 @@
"subtasks": [
{
"id": "sub_001",
"title": "Dashboard is live and accessible \u2705",
"title": "Dashboard is live and accessible ",
"done": true
},
{
@@ -32,8 +32,8 @@
},
{
"id": "ATZ-001",
"title": "\ud83e\uddea Test Orchestration: Material Trade Study Mini-Project",
"description": "End-to-end test of the Atomizer HQ orchestration pipeline.\n\n**Objective:** Compare two candidate materials for a hypothetical lightweight bracket:\n- 7075-T6 Aluminum\n- Ti-6Al-4V Titanium\n\n**Criteria:** Strength-to-weight, cost, machinability, fatigue life\n\n**Expected workflow:**\n1. Manager receives this task\n2. Manager spawns Webster \u2192 research material properties\n3. Manager spawns Tech Lead \u2192 evaluate trade-offs\n4. Manager spawns Auditor \u2192 review the evaluation\n5. Manager spawns Secretary \u2192 write summary to #reports\n\nThis is a TEST to validate the orchestration pipeline works end-to-end.",
"title": "🧪 Test Orchestration: Material Trade Study Mini-Project",
"description": "End-to-end test of the Atomizer HQ orchestration pipeline.\n\n**Objective:** Compare two candidate materials for a hypothetical lightweight bracket:\n- 7075-T6 Aluminum\n- Ti-6Al-4V Titanium\n\n**Criteria:** Strength-to-weight, cost, machinability, fatigue life\n\n**Expected workflow:**\n1. Manager receives this task\n2. Manager spawns Webster research material properties\n3. Manager spawns Tech Lead evaluate trade-offs\n4. Manager spawns Auditor review the evaluation\n5. Manager spawns Secretary write summary to #reports\n\nThis is a TEST to validate the orchestration pipeline works end-to-end.",
"status": "backlog",
"project": "test",
"tags": [
@@ -75,7 +75,7 @@
},
{
"id": "ATZ-749aac",
"title": "\ud83d\udccb Standardization Review \u2014 Project Structure & Protocols",
"title": "📋 Standardization Review Project Structure & Protocols",
"description": "Review and standardize all agent project structures, communication protocols, and deliverable formats.\\n\\nThis was discussed and reviewed but never tracked on the dashboard.\\n\\nScope:\\n- Agent workspace structure standards\\n- Task lifecycle protocol\\n- Deliverable schema enforcement\\n- Communication routing rules",
"status": "review",
"project": "standards",
@@ -87,19 +87,25 @@
},
{
"id": "ATZ-2f1634",
"title": "\ud83d\udd27 P-Adaptive-Isogrid \u2014 Plate Lightweighting Tool",
"description": "Automated plate lightweighting via isogrid pattern optimization.\\n\\nArchitecture: Python Brain + NX Hands + Atomizer Manager\\nRepo: Atomizer/tools/adaptive-isogrid/\\n15 optimization params (Optuna TPE), AFEM with superposed models\\n\\nPhases:\\n- Phase 0: Foundation \u2705\\n- Phase 1: Python Brain standalone (CURRENT)\\n- Phase 2: NX sandbox scripts\\n- Phase 3: Full integration",
"title": "🔧 P-Adaptive-Isogrid Plate Lightweighting Tool",
"description": "Automated plate lightweighting via isogrid pattern optimization.\\n\\nArchitecture: Python Brain + NX Hands + Atomizer Manager\\nRepo: Atomizer/tools/adaptive-isogrid/\\n15 optimization params (Optuna TPE), AFEM with superposed models\\n\\nPhases:\\n- Phase 0: Foundation \\n- Phase 1: Python Brain standalone (CURRENT)\\n- Phase 2: NX sandbox scripts\\n- Phase 3: Full integration",
"status": "in_progress",
"project": "engineering",
"tags": [],
"subtasks": [],
"priority": "high",
"createdAt": "2026-02-19T01:32:13.987900+00:00",
"comments": []
"comments": [
{
"text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.",
"timestamp": "2026-04-01T08:44:12.763086+00:00",
"author": "manager"
}
]
},
{
"id": "ATZ-74f02a",
"title": "\ud83e\udd16 Atomizer Overhaul \u2014 Framework Agentic",
"title": "🤖 Atomizer Overhaul Framework Agentic",
"description": "Transform Atomizer into multi-agent FEA optimization company.\\n\\n8 agents deployed on Discord/Slack cluster.\\nPhase 0: LIVE since 2026-02-08.\\n\\nInfrastructure:\\n- 8 OpenClaw instances (systemd template)\\n- Dedicated Slack + Discord workspaces\\n- Orchestration via orchestrate.sh + workflow.py\\n\\nCurrent focus: Agent protocols, dashboard integration, task enforcement.",
"status": "in_progress",
"project": "infrastructure",
@@ -111,7 +117,7 @@
},
{
"id": "ATZ-c13dfc",
"title": "\u2699\ufe0f Atomizer Core \u2014 Foundation Development",
"title": "⚙️ Atomizer Core Foundation Development",
"description": "Core Atomizer framework development.\\n\\nRepo: /home/papa/repos/Atomizer/\\nKnowledge base: Atomizer/knowledge_base/\\n\\nOngoing work:\\n- Code architecture improvements\\n- Knowledge base maintenance (LAC session insights)\\n- Documentation and QUICK_REF updates\\n- Bridge doc: PROJECT_STATUS.md",
"status": "permanent",
"project": "engineering",
@@ -123,7 +129,7 @@
},
{
"id": "ATZ-d3fce9",
"title": "Project Standard \u2014 War Room & Final Recommendation",
"title": "Project Standard War Room & Final Recommendation",
"description": "Full team orchestration for Atomizer Project Standard v2.0. Included: Auditor deep review, Tech Lead codebase analysis, 4-model war room challenge (Opus/Codex/Sonnet x2), Manager synthesis. Deliverables saved to PKM: 02-AUDIT-PRACTICALITY.md, 03-AUDIT-DETAILED.md, 04-WAR-ROOM-NOTES.md, 05-FINAL-RECOMMENDATION.md",
"status": "review",
"project": "atomizer-project-standard",
@@ -161,12 +167,12 @@
},
{
"id": "sub_007",
"title": "Manager: Synthesis \u2014 04-WAR-ROOM-NOTES.md to PKM",
"title": "Manager: Synthesis 04-WAR-ROOM-NOTES.md to PKM",
"done": true
},
{
"id": "sub_008",
"title": "Manager: Final recommendation \u2014 05-FINAL-RECOMMENDATION.md to PKM",
"title": "Manager: Final recommendation 05-FINAL-RECOMMENDATION.md to PKM",
"done": true
},
{
@@ -179,7 +185,7 @@
"createdAt": "2026-02-19T12:31:22.327955+00:00",
"comments": [
{
"text": "Retroactive ticket creation. All agent work completed 2026-02-19. Task in review status \u2014 awaiting Antoine's approval of 05-FINAL-RECOMMENDATION.md. Remaining: sub_009 (CEO review).",
"text": "Retroactive ticket creation. All agent work completed 2026-02-19. Task in review status awaiting Antoine's approval of 05-FINAL-RECOMMENDATION.md. Remaining: sub_009 (CEO review).",
"timestamp": "2026-02-19T12:31:39.487292+00:00",
"author": "agent"
}
@@ -187,7 +193,7 @@
},
{
"id": "ATZ-839392",
"title": "Project Standard \u2014 Introspection Placement War Room",
"title": "Project Standard Introspection Placement War Room",
"description": "War room to determine where model introspection data lives in the project structure. Two levels: project-level baseline introspection (models/) and study-level introspection (per-study). Must integrate cleanly with the approved v2.0 structure. Deliverables: war-room note + introspection addendum to final recommendation, both to PKM.",
"status": "in_progress",
"project": "atomizer-project-standard",
@@ -226,6 +232,11 @@
"text": "Codebase survey complete. 3 challengers spawned: Opus, Codex, Sonnet. Existing tools: introspect_part.py (NX journal, .prt), introspect_sim.py (NX journal, .sim), 30+ pyNastran extractors (.op2/.f06/.fem).",
"timestamp": "2026-02-19T12:51:32.188229+00:00",
"author": "agent"
},
{
"text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.",
"timestamp": "2026-04-01T08:44:12.763086+00:00",
"author": "manager"
}
]
},
@@ -241,7 +252,7 @@
"createdAt": "2026-02-19T20:23:18.894957+00:00",
"comments": [
{
"text": "\u2705 Completed: War room complete. Option C approved by CEO. Consolidation note written to 2-Projects/P-Atomizer-Project-Standard/06-WAR-ROOM-INTROSPECTION.md",
"text": " Completed: War room complete. Option C approved by CEO. Consolidation note written to 2-Projects/P-Atomizer-Project-Standard/06-WAR-ROOM-INTROSPECTION.md",
"timestamp": "2026-02-19T20:23:24.991854+00:00",
"author": "agent"
}
@@ -259,7 +270,7 @@
"createdAt": "2026-02-20T15:24:30.807810+00:00",
"comments": [
{
"text": "\u2705 Completed: All 6 war-room documents produced and saved to obsidian vault. Gateway spawn issue prevented team delegation - completed directly.",
"text": " Completed: All 6 war-room documents produced and saved to obsidian vault. Gateway spawn issue prevented team delegation - completed directly.",
"timestamp": "2026-02-20T15:33:18.787619+00:00",
"author": "agent"
}

View File

@@ -38,7 +38,7 @@
## Knowledge Base
- LAC insights: `/home/papa/repos/Atomizer/knowledge_base/lac/`
- Project contexts: `/home/papa/repos/Atomizer/knowledge_base/projects/`
- Project contexts: not yet established as a dedicated repo folder under `/home/papa/repos/Atomizer/knowledge_base/` — verify actual project knowledge location before linking new docs there
## 📊 Mission-Dashboard (MANDATORY)
The Atomizer-HQ Mission-Dashboard is the **single source of truth** for all tasks.

View File

@@ -1,27 +0,0 @@
# 2026-03-01
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Feb 28. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (21 days) — within 30-day retention, no pruning needed.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- PROJECT_STATUS.md: updated timestamp.
- All key file paths verified — no broken references (10 paths checked, all OK).
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- Day 6 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed — nothing to optimize without active work.
### SELF-DOCUMENT
- PROJECT_STATUS.md timestamp updated.
- No other changes needed.

View File

@@ -1,25 +0,0 @@
# 2026-03-02
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 1. Zero modified files detected (only PROJECT_STATUS.md timestamp touched).
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (22 days) — within 30-day retention, no pruning needed.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key file paths verified (4 checked, all OK).
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- Day 7 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- No changes needed. Docs reflect current state.

View File

@@ -1,27 +0,0 @@
# 2026-03-03
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 2. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (23 days) — within 30-day retention, no pruning needed yet. Will hit 30-day mark on Mar 10.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- PROJECT_STATUS.md: updated timestamp.
- All key paths verified — no broken references.
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- Day 8 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- PROJECT_STATUS.md timestamp updated.
- No other changes needed.

View File

@@ -1,25 +0,0 @@
# 2026-03-04
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 3. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (24 days) — approaching 30-day retention. Will archive Feb 8 + Feb 9 on ~Mar 10.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key paths verified intact (taskboard, PROJECT_STATUS, CLUSTER, MEMORY, QUICK_REF, mc-update.sh).
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- Day 9 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- No doc changes needed. All current.

View File

@@ -1,25 +0,0 @@
# 2026-03-05
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 4. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory files: Feb 8 (25 days), Feb 9 (24 days) — approaching 30-day retention. Archive scheduled for ~Mar 10.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key paths verified intact (taskboard.json, PROJECT_STATUS.md, CLUSTER.md, mc-update.sh).
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- Day 12 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- No doc changes needed. All current.

View File

@@ -1,25 +0,0 @@
# 2026-03-06
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 5. Zero meaningful file changes detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 9 (25 days). Archive due ~Mar 11.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key paths verified intact (taskboard.json, PROJECT_STATUS.md, CLUSTER.md, mc-update.sh, mission-control tasks.json).
- Blockers unchanged: projects awaiting CEO input.
### EVOLVE
- Day 13 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- No doc changes needed. All current.

View File

@@ -1,25 +0,0 @@
# 2026-03-07
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Mar 6. Zero file changes detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 10 (25 days). Archive due ~Mar 12.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- Key paths verified intact: taskboard.json ✓, PROJECT_STATUS.md ✓.
- Blockers unchanged: projects awaiting CEO input.
### EVOLVE
- Day 14 of zero activity. Team idle, waiting on CEO directives.
- No process changes needed.
### SELF-DOCUMENT
- No doc changes needed. All current.

View File

@@ -1,24 +0,0 @@
# 2026-03-08
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero file changes since Mar 7. Day 15 of idle.
### DISCARD
- **Archived** `2026-02-08.md` and `2026-02-09.md` (30+ days old). Key facts already in MEMORY.md.
- Next archive due: Feb 10 (~Mar 12).
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- Key paths verified: taskboard.json ✓, PROJECT_STATUS.md ✓, mc-update.sh ✓.
- Blockers unchanged: 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).
### EVOLVE
- **Observation:** 15 consecutive idle digestion logs (Feb 24 → Mar 8) are nearly identical boilerplate. The nightly cron is generating noise, not value. **Recommendation:** When idle >7 days, digestion should auto-compact to a single weekly entry instead of nightly. Propose this as OP_11 amendment when Antoine is active.
### SELF-DOCUMENT
- No doc changes needed.

View File

@@ -1,22 +0,0 @@
# 2026-03-09
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero file changes since Mar 7. Day 16 of idle.
### DISCARD
- No logs eligible for archiving yet (Feb 10 = 27 days old, due ~Mar 12).
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- Verified workspace unchanged. No broken paths or stale references introduced.
### EVOLVE
- Standing recommendation from Mar 8 still applies: propose OP_11 amendment for weekly-only digestion during idle stretches (>7 days no activity). 16 consecutive near-identical nightly logs confirm the need.
### SELF-DOCUMENT
- No doc changes needed.

View File

@@ -1,22 +0,0 @@
# 2026-03-10
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero file changes since Mar 7. Day 17 of idle.
### DISCARD
- No logs eligible yet (Feb 10 = 28 days, threshold = 30). First archive batch due Mar 12.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- Workspace unchanged. No broken paths or stale references.
### EVOLVE
- Standing recommendation (since Mar 8): propose OP_11 amendment for weekly-only digestion during idle stretches (>7 days no activity). 17 consecutive near-identical nightly logs confirm this.
### SELF-DOCUMENT
- No doc changes needed.

View File

@@ -1,28 +0,0 @@
# 2026-03-11
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero file changes since Mar 7. Day 18 of idle.
### DISCARD
- Feb 10 log = 29 days old. First archival batch (Feb 10) due tomorrow Mar 12.
- 10 March daily logs (Mar 110) contain only digestion cycle entries with no substantive activity. These are noise themselves — will compress into single archive summary when they reach 30 days.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key paths verified: taskboard, mc-update.sh, mission-control, war-room-isogrid, standardization, Atomizer repo, Obsidian vault — all OK.
- No broken references found.
- No agent workspace had any file changes since Mar 7.
### EVOLVE
- **FORMAL AMENDMENT PROPOSAL (19th consecutive near-identical nightly cycle):**
OP_11 §Triggers should add an idle-mode rule: when no file changes across any workspace for >7 consecutive days, switch nightly digestion to **weekly-only** (e.g., Wednesday 4 AM). Resume nightly when activity resumes. This would have avoided 12+ redundant cycles this month alone.
- Propose adding to OP_11: "**Idle Mode:** If no workspace file changes detected for 7+ consecutive days, digestion frequency drops to weekly until activity resumes."
- Requires CEO approval per protocol change rules.
### SELF-DOCUMENT
- No doc changes needed. All docs still reflect current state accurately.

View File

@@ -1,30 +0,0 @@
# 2026-03-12
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero file changes across all workspaces since Mar 7. Day 19 of idle.
### DISCARD
- **Archived Feb 10 daily log** (30 days old) → `memory/archive/2026-02-10.md`
- Biggest single day of Hydrotech Beam work. Archive summary preserves all key facts, commits, technical specs, and open items.
- Original removed from active memory directory.
- Feb 11 log reaches 30-day threshold tomorrow (Mar 13) — queued for next cycle.
- Mar 111 daily logs continue to contain only digestion-cycle entries (no substantive activity). Will compress when they hit 30 days.
- No contradictions found.
### SORT
- Nothing to promote or reorganize. All key Feb 10 findings were already stored in MEMORY.md and project KB during the active phase.
### REPAIR
- All key paths verified: taskboard.json, mc-update.sh, mission-control tasks, QUICK_REF.md, CLUSTER.md, taskboard skill, orchestrate skill, AGENTS_REGISTRY.json, mission-control-protocol.md — **all OK**.
- No agent workspace changes since Mar 7.
- No broken references found.
### EVOLVE
- **Standing amendment proposal (20th consecutive near-identical nightly cycle):**
OP_11 §Triggers idle-mode rule: when no workspace file changes for >7 consecutive days, switch nightly digestion to **weekly-only**. Resume nightly when activity resumes. This cycle archived 1 log — the only substantive action in 20 nightly runs. Weekly would have caught this on the same schedule.
- **Requires CEO approval** per protocol change rules.
### SELF-DOCUMENT
- No doc changes needed. All docs reflect current state.

View File

@@ -0,0 +1,30 @@
# 2026-03-29
## Nightly Digestion — OP_11 (Incremental)
### STORE
- Reviewed current manager/shared state plus cross-workspace memory surfaces with recent or still-actionable content.
- Captured tonight's digestion outcome in this daily note rather than promoting any new domain/project knowledge; no fresh technical lessons surfaced.
### DISCARD
- Identified stale outage-era assumptions that were still phrased like active blockers.
- Did not delete old agent memory files tonight; many are sparse and better handled in a dedicated archive pass with per-agent summaries.
### SORT
- Kept the fixes at the shared/process layer because they affect multiple agents and status docs, not a single project.
- Left historical planning docs in `context-docs/` untouched; they are founding artifacts even where they still use legacy Clawdbot wording.
### REPAIR
- Repaired `manager/TOOLS.md` to remove a broken `knowledge_base/projects/` path reference.
- Updated `shared/PROJECT_STATUS.md` timestamp for this digestion pass.
- Repaired `shared/PROJECT_STATUS.md` to stop presenting Webster's old search/API-key issue as a current blocker without re-verification.
- Reframed `secretary/memory/pending.md` outage note as historical delivery debt rather than proof of an active current messaging failure.
- Verified that the repo still contains `knowledge_base/` and `knowledge_base/lac/`, but no dedicated `knowledge_base/projects/` directory yet.
### EVOLVE
- Recurring drift pattern: historical outage notes and early-platform assumptions tend to survive as if still current. Future digestion passes should explicitly classify notes as either historical, active, or resolved.
- Recommended next pass: scan remaining high-signal manager context docs and audits for legacy platform/runtime wording, but preserve historical planning docs unless rewriting them intentionally.
### SELF-DOCUMENT
- Updated live operational docs/status files only.
- No changes needed tonight to Manager `SOUL.md`, `IDENTITY.md`, or taskboard/process ownership docs.

View File

@@ -0,0 +1,30 @@
# 2026-04-01
## Nightly Digestion — OP_11 (Incremental)
### STORE
- Reviewed current manager long-term memory, recent digestion history, `shared/PROJECT_STATUS.md`, and cross-workspace memory/doc timestamps.
- Confirmed no new substantive agent-workspace activity since the Mar 29 digestion pass; no new technical/project facts required promotion tonight.
- Preserved the only meaningful lesson from the Mar 112 idle run by compressing those notes into `memory/archive/2026-03-01_to_2026-03-12_idle-digestion.md`.
### DISCARD
- Pruned twelve stale manager daily notes past retention threshold by archiving and removing `2026-03-01.md` through `2026-03-12.md`.
- Confirmed those files were repetitive idle-period digestion logs and did not merit separate active-memory retention.
- No contradictions found in active manager memory during this pass.
### SORT
- Kept the March 112 compression at the archive level because it is historical operational context, not company doctrine.
- Left project facts in `MEMORY.md` and `shared/PROJECT_STATUS.md` at the correct abstraction level.
### REPAIR
- Refreshed `shared/PROJECT_STATUS.md` timestamp for the current digestion cycle.
- Spot-checked current operational surfaces: manager/shared docs and recent memory files remain internally consistent with the presently quiet HQ state.
- No new broken path references were introduced in the reviewed files.
### EVOLVE
- The idle-noise pattern remains real: long stretches of nightly digestion still create low-value repetition when no work changed.
- Existing amendment proposal stands: add an OP_11 idle-mode rule to reduce cadence during 7+ day no-change windows. This remains a proposal only and needs CEO approval before protocol change.
### SELF-DOCUMENT
- Added this digestion note.
- No changes needed tonight to Manager `MEMORY.md`, `SOUL.md`, `IDENTITY.md`, `AGENTS.md`, or `TOOLS.md`.

View File

@@ -0,0 +1,34 @@
# 2026-03-01 to 2026-03-12 — Idle Digestion Archive
## Summary
This archive compresses twelve consecutive nightly OP_11 digestion entries from an extended idle period. Across this span, no substantive project or agent-workspace activity resumed. The repeated outcomes were consistent:
- No new activity across agent workspaces
- No CEO corrections or new directives
- No contradictions found in active manager memory
- Key operational paths remained valid when spot-checked
- Main open items remained unchanged: Hydrotech Beam, Atomizer Project Standard, and Adaptive Isogrid awaiting CEO input
## Notable Actions Preserved
### 2026-03-08
- Archived `2026-02-08.md` and `2026-02-09.md` after they crossed the 30-day retention threshold.
- Recorded a process-improvement observation: nightly digestion during long idle stretches was producing repetitive low-value logs.
### 2026-03-11
- Elevated the idle-noise pattern into a formal amendment proposal for OP_11:
- If no workspace file changes occur for 7+ consecutive days, digestion frequency should drop from nightly to weekly until activity resumes.
- This remains a proposal only and would require CEO approval.
### 2026-03-12
- Archived `2026-02-10.md` after it crossed the 30-day retention threshold.
- Confirmed again that the March 112 logs themselves were mostly boilerplate digestion output and suitable for later compression.
## Operational State During This Window
- Team status: effectively idle
- No broken references found in the spot-checked manager/shared operational paths
- No documentation changes required during the period
- No new domain/project knowledge needed promotion to long-term memory
## Why These Files Were Compressed
These twelve daily notes were all digestion-only entries from the same idle stretch and did not each justify separate active-memory retention. This archive preserves the meaningful signal while removing repetitive noise from the live memory directory.

View File

@@ -21,4 +21,4 @@
- **Updated:** 2026-02-14 (digestion cycle)
## System Alert: Messaging / Delivery Failure
- The `message` tool was failing during this capture period, preventing automated reports and manual messages from being sent. Treat this as a routing/delivery issue until reconfirmed, not specifically a Discord-only problem.
- Historical note from the earlier outage window: the `message` tool was failing during that capture period, preventing automated reports and manual messages from being sent. Treat these pending items as old delivery debt to verify/release, not as proof of an active current outage.

View File

@@ -1,5 +1,5 @@
# Project Status Dashboard
Updated: 2026-03-20 04:00 AM (Nightly Digestion OP_11)
Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11)
## Active Projects
@@ -61,7 +61,7 @@ Updated: 2026-03-20 04:00 AM (Nightly Digestion OP_11)
## Outstanding Blockers
- **3 projects** awaiting CEO input (Hydrotech, Project Standard, Isogrid) — deprioritized while Antoine focuses on GigaBIT M1
- **Webster** web_search API key still missing (needs Mario, since Feb 19)
- No newly verified infrastructure blockers during this digestion pass; prior Webster search-tool/API-key issue appears historical and should only be reinstated if it reproduces
## Mission Control — Stale Tasks
Several MC tasks have been in `in_progress` or `review` since mid-February with no updates: