# Pending Items — Needs Antoine's Attention
## P-Adaptive-Isogrid SOTA Review — CRITICAL RISK IDENTIFIED
- **Summary:** The SOTA review for the P-Adaptive-Isogrid tool is complete. It identified a **critical risk**: the tool is completely blind to buckling, a primary failure mode.
- **Plan:** A prioritized list of 5 improvements has been established, with an analytical buckling check as the highest priority.
- **Deliverable:** `/home/papa/atomizer/hq/condensations/2026-02-16-isogrid-sota-review.md`
- **Action:** Inform Antoine when the current messaging/delivery path is confirmed working again.
## Thermal Analysis Report
- **Summary:** A thermal analysis report has been summarized and is ready for review.
- **Action:** Post to #reports once the current messaging/delivery path is confirmed working again.
## Delegation Task
- **Summary:** A delegation task has completed but could not post its report.
- **Action:** Post to the relevant channel once the current messaging/delivery path is confirmed working again.
## Hydrotech Beam Project — Status
- Technical gaps resolved, displacement constraint relaxed 10mm → 20mm (DEC-HB-012, CEO approved)
- Mass NaN bug fixed (commit `580ed65`)
- **Next:** Pull fix on dalidou, test single trial, re-run full DOE with 20mm constraint
- **Updated:** 2026-02-14 (digestion cycle)
## System Alert: Messaging / Delivery Failure
- Historical note from the earlier outage window: the `message` tool was failing during that capture period, preventing automated reports and manual messages from being sent. Treat these pending items as old delivery debt to verify/release, not as proof of an active current outage.