Antoine 3718a8d5c8 Fix NX solve: backup/restore master model, archive outputs to iterations
NX .sim files store absolute internal references to .fem/.prt files.
Copying them to iteration folders breaks these references (Parts.Open
returns None). Instead:

1. Backup master model once at study start
2. Restore from backup before each trial (isolation)
3. Solve on master model in-place (NX references intact)
4. Archive solver outputs (OP2/F06) + params.exp to iterations/iterNNN/
5. params.exp in each iteration: import into NX to recreate any trial

iteration_manager.py kept for future use but not wired in.
2026-02-11 15:05:18 +00:00
..
2026-02-10 08:00:22 +00:00
2026-02-11 08:00:20 +00:00
2026-02-10 08:00:22 +00:00
2026-02-10 08:00:22 +00:00

Hydrotech Beam — Structural Optimization

Client: Hydrotech (internal test fixture) Channel: #project-hydrotech-beam Created: 2026-02-08 Status: Technical Breakdown Complete — Awaiting Gap Resolution


Objective

Optimize a sandwich I-beam with lightening holes: minimize mass while meeting stiffness and strength constraints.

Key Numbers

Metric Baseline Target
Mass ~974 kg Minimize
Tip displacement ~22 mm ≤ 10 mm
Von Mises stress TBD ≤ 130 MPa

Design Variables

Variable Range Type
Half-core thickness 1040 mm Continuous
Face thickness 1040 mm Continuous
Hole diameter 150450 mm Continuous
Hole count 515 Integer

Approach

Two-phase optimization:

  1. DoE (LHS, 4050 trials) — map the landscape
  2. TPE (Bayesian, 60100 trials) — converge to optimum

Total budget: ~100150 NX evaluations, est. 25 hours compute.

Project Structure

hydrotech-beam/
├── README.md              ← You are here
├── CONTEXT.md             # Intake requirements
├── BREAKDOWN.md           # Technical analysis
├── DECISIONS.md           # Decision log
├── models/                # Reference NX models (golden copies)
├── kb/                    # Living knowledge base
│   ├── components/        # Per-component knowledge
│   ├── materials/         # Material data
│   ├── fea/               # FEA model knowledge
│   └── dev/               # Generation documents
├── images/                # Screenshots, plots, renders
├── studies/               # Optimization campaigns
│   └── 01_doe_landscape/  # (first study — pending)
└── deliverables/          # Final reports and recommendations

Key Documents

Team

Role Agent Status
Manager 🎯 Manager Coordinating
Technical Lead 🔧 Tech Lead Breakdown complete
CEO Antoine Gap resolution pending