Files
Atomizer/hq/workspaces/manager/memory/2026-03-20.md

3.3 KiB
Raw Blame History

2026-03-20

Nightly Digestion — OP_11 (Incremental/Weekly)

Note: 8-day gap since last digestion (Mar 12). No nightly logs exist for Mar 1319 — likely cron delivery issue or gateway downtime during that period.

STORE

  • NEW PROJECT DISCOVERED: GigaBIT M1 — Reference Frame Stiffness Characterization (P04-GigaBIT-M1). Client: StarSpec (Adyn Miles). Active since Mar 4. Antoine working directly on this. Hybrid B+D method, SOL 101, ~42 runs. ΔWFE ≤1.0 nm RMS budget.
  • Zernike V&V COMPLETE: P-Zernike-Validation finished Mar 9. 18 test cases, prysm cross-validation to machine precision. Risk reduction for M2/M3 ordering. Commits f9373be, 075ad36.
  • Tier 2 dev workflow: Windows test runner + Syncthing result sync added Mar 7 (commit b3162aa).
  • Updated MEMORY.md with new projects and reprioritized project list.
  • Updated PROJECT_STATUS.md (was stale since Mar 3 — now current).

DISCARD

  • Archived 2026-02-11.md and 2026-02-13.md (37+ days old). Key facts preserved in archive summaries.
  • Compressed 15 idle-only daily logs (Feb 26 Mar 12) into single archive summary (archive/2026-02-26_to_2026-03-12_idle-period.md). These contained only digestion-cycle boilerplate with zero substantive activity. Originals retained (not yet 30 days) but archive summary created for when they age out.
  • Feb 19 hits 30-day threshold tomorrow — queued for next cycle.

SORT

  • GigaBIT M1 promoted to top of Active Projects in MEMORY.md (it's where Antoine is spending time).
  • Hydrotech Beam deprioritized with note that Antoine is focused on GigaBIT now.
  • Zernike V&V logged as completed project with cross-references.

REPAIR

  • All 12 key infrastructure paths verified ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate tools, MCP server, protocols)
  • All 7 agent workspaces present
  • Mission Control dashboard responding (HTTP 200) ✓
  • PROJECT_STATUS.md was 17 days stale (last updated Mar 3) — now updated with GigaBIT M1 and current state.
  • 7 Mission Control tasks stuck in in_progress or review since mid-February — flagged for cleanup when Antoine returns to HQ work.
  • Gap identified: Mar 1319 digestion logs missing. Cron job may have had delivery issues or gateway was down. No data loss — just missing the nightly check-ins.

EVOLVE

  • Standing OP_11 amendment proposal (since Mar 8, now 12 days): idle-mode rule for weekly-only digestion when no workspace changes for 7+ days. Requires CEO approval.
  • Observation: Antoine is doing significant direct work (GigaBIT M1, Zernike V&V, dev workflow) without HQ agent involvement. The team may need to be more proactive about supporting active client work vs. waiting to be tasked.
  • Recommendation: When Antoine next engages HQ, offer GigaBIT M1 support (Tech Lead for sensitivity analysis, Optimizer for stiffness sweep design, Webster for literature on mirror mount compliance requirements).

SELF-DOCUMENT

  • MEMORY.md updated with GigaBIT M1 project, Zernike V&V completion, and reprioritized project list.
  • PROJECT_STATUS.md fully refreshed (was 17 days stale).
  • No changes needed to SOUL.md, IDENTITY.md, or TOOLS.md — all still accurate.
  • Agent workspace docs (other agents) not checked this cycle — no activity detected in their workspaces.