Files
Atomizer/hq/workspaces/manager/memory/2026-03-20.md

42 lines
3.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# 2026-03-20
## Nightly Digestion — OP_11 (Incremental/Weekly)
**Note:** 8-day gap since last digestion (Mar 12). No nightly logs exist for Mar 1319 — likely cron delivery issue or gateway downtime during that period.
### STORE
- **NEW PROJECT DISCOVERED:** GigaBIT M1 — Reference Frame Stiffness Characterization (P04-GigaBIT-M1). Client: StarSpec (Adyn Miles). Active since Mar 4. Antoine working directly on this. Hybrid B+D method, SOL 101, ~42 runs. ΔWFE ≤1.0 nm RMS budget.
- **Zernike V&V COMPLETE:** P-Zernike-Validation finished Mar 9. 18 test cases, prysm cross-validation to machine precision. Risk reduction for M2/M3 ordering. Commits `f9373be`, `075ad36`.
- **Tier 2 dev workflow:** Windows test runner + Syncthing result sync added Mar 7 (commit `b3162aa`).
- Updated MEMORY.md with new projects and reprioritized project list.
- Updated PROJECT_STATUS.md (was stale since Mar 3 — now current).
### DISCARD
- **Archived** `2026-02-11.md` and `2026-02-13.md` (37+ days old). Key facts preserved in archive summaries.
- **Compressed 15 idle-only daily logs** (Feb 26 Mar 12) into single archive summary (`archive/2026-02-26_to_2026-03-12_idle-period.md`). These contained only digestion-cycle boilerplate with zero substantive activity. Originals retained (not yet 30 days) but archive summary created for when they age out.
- Feb 19 hits 30-day threshold tomorrow — queued for next cycle.
### SORT
- GigaBIT M1 promoted to top of Active Projects in MEMORY.md (it's where Antoine is spending time).
- Hydrotech Beam deprioritized with note that Antoine is focused on GigaBIT now.
- Zernike V&V logged as completed project with cross-references.
### REPAIR
- **All 12 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate tools, MCP server, protocols)
- **All 7 agent workspaces present** ✓
- **Mission Control dashboard** responding (HTTP 200) ✓
- **PROJECT_STATUS.md was 17 days stale** (last updated Mar 3) — now updated with GigaBIT M1 and current state.
- **7 Mission Control tasks stuck** in `in_progress` or `review` since mid-February — flagged for cleanup when Antoine returns to HQ work.
- **Gap identified:** Mar 1319 digestion logs missing. Cron job may have had delivery issues or gateway was down. No data loss — just missing the nightly check-ins.
### EVOLVE
- **Standing OP_11 amendment proposal** (since Mar 8, now 12 days): idle-mode rule for weekly-only digestion when no workspace changes for 7+ days. Requires CEO approval.
- **Observation:** Antoine is doing significant direct work (GigaBIT M1, Zernike V&V, dev workflow) without HQ agent involvement. The team may need to be more proactive about supporting active client work vs. waiting to be tasked.
- **Recommendation:** When Antoine next engages HQ, offer GigaBIT M1 support (Tech Lead for sensitivity analysis, Optimizer for stiffness sweep design, Webster for literature on mirror mount compliance requirements).
### SELF-DOCUMENT
- MEMORY.md updated with GigaBIT M1 project, Zernike V&V completion, and reprioritized project list.
- PROJECT_STATUS.md fully refreshed (was 17 days stale).
- No changes needed to SOUL.md, IDENTITY.md, or TOOLS.md — all still accurate.
- Agent workspace docs (other agents) not checked this cycle — no activity detected in their workspaces.