25 lines
1.4 KiB
Markdown
25 lines
1.4 KiB
Markdown
# Pending Items — Needs Antoine's Attention
|
|
|
|
## P-Adaptive-Isogrid SOTA Review — CRITICAL RISK IDENTIFIED
|
|
- **Summary:** The SOTA review for the P-Adaptive-Isogrid tool is complete. It identified a **critical risk**: the tool is completely blind to buckling, a primary failure mode.
|
|
- **Plan:** A prioritized list of 5 improvements has been established, with an analytical buckling check as the highest priority.
|
|
- **Deliverable:** `/home/papa/atomizer/hq/condensations/2026-02-16-isogrid-sota-review.md`
|
|
- **Action:** Inform Antoine as soon as Discord communication is restored.
|
|
|
|
## Thermal Analysis Report
|
|
- **Summary:** A thermal analysis report has been summarized and is ready for review.
|
|
- **Action:** Post to #reports channel once Discord communication is restored.
|
|
|
|
## Delegation Task
|
|
- **Summary:** A delegation task has completed but could not post its report.
|
|
- **Action:** Post to relevant channel once Discord communication is restored.
|
|
|
|
## Hydrotech Beam Project — Status
|
|
- Technical gaps resolved, displacement constraint relaxed 10mm → 20mm (DEC-HB-012, CEO approved)
|
|
- Mass NaN bug fixed (commit `580ed65`)
|
|
- **Next:** Pull fix on dalidou, test single trial, re-run full DOE with 20mm constraint
|
|
- **Updated:** 2026-02-14 (digestion cycle)
|
|
|
|
## System Alert: Discord Communication Failure
|
|
- The `message` tool is consistently failing. This is preventing automated reports and manual messages from being sent. Needs investigation.
|