96 lines
5.3 KiB
Markdown
96 lines
5.3 KiB
Markdown
# 2026-02-22
|
|
|
|
## Nightly Digestion — OP_11 (Incremental)
|
|
|
|
### STORE
|
|
- New artifact: `MIND_MAP_AUDIT.md` (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality.
|
|
- No new Antoine corrections. No new project activity. Weekend quiet period continues.
|
|
|
|
### DISCARD
|
|
- Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention
|
|
- **Flagged:** Tech Lead has 2 legacy files from 2025 (`2025-02-09.md`, `2025-07-17.md`) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion.
|
|
- No contradictions found in current memory files
|
|
- No stale TODOs — all 3 active projects genuinely awaiting CEO input
|
|
|
|
### SORT
|
|
- MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note)
|
|
- No patterns to promote — quiet weekend
|
|
|
|
### REPAIR
|
|
- PROJECT_STATUS.md still accurate — no state changes since Feb 20
|
|
- MEMORY.md still accurate
|
|
- All key paths verified: `shared/standardization/`, `shared/war-room-isogrid/`, `shared/war-room-overhaul/` intact
|
|
- Outstanding blockers unchanged:
|
|
- Hydrotech Beam: blocked on Antoine (dalidou pull + test)
|
|
- Project Standard: awaiting CEO decision (full spec vs MVS)
|
|
- Adaptive Isogrid: awaiting CEO review
|
|
- Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved
|
|
- Webster web_search API key: still needs Mario
|
|
|
|
### EVOLVE
|
|
- No process issues this cycle
|
|
- Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck.
|
|
- MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase
|
|
|
|
### SELF-DOCUMENT
|
|
- No changes needed — docs current
|
|
|
|
---
|
|
|
|
## AOM Project — MASSIVE Session (afternoon)
|
|
|
|
### What Happened
|
|
Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering:
|
|
|
|
1. **AOM Phase 3 completed** — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines).
|
|
|
|
2. **Phase 4 (LLM Layer) completed** — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module.
|
|
|
|
3. **Phase 5 (Living Protocol) completed** — maintenance rules, update triggers, health checks, ownership model.
|
|
|
|
4. **Tool-Agnostic Architecture Plan** — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote `ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure.
|
|
|
|
5. **AOM V2 Integration** — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases:
|
|
- Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference)
|
|
- Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap)
|
|
- Phase C: 19 surgical updates across all pillars
|
|
- Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev)
|
|
- Phase E: MAP + final updates
|
|
|
|
**Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.**
|
|
|
|
6. **V2 Migration Master Plan** — Antoine confirmed new repo at `http://192.168.86.50:3000/Antoine/Atomizer-V2` (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy.
|
|
|
|
### Key Decisions Made (by Antoine)
|
|
- DEC-030: Tool-agnostic architecture approved
|
|
- DEC-032: New repo (V2) instead of cleaning V1
|
|
- DEC-033: Documentation-first — AOM before code
|
|
- DEC-021: AOM stays in Obsidian until migration
|
|
- V2 Gitea repo created at `192.168.86.50:3000/Antoine/Atomizer-V2`
|
|
|
|
### CEO Decisions Still Pending (for migration)
|
|
1. License type (Apache 2.0 / MIT)
|
|
2. GitHub repo name
|
|
3. Obsidian ↔ repo sync strategy
|
|
4. HQ separation (in V2 or separate?)
|
|
5. Confirm projects/ stays off git
|
|
6. GitHub visibility (public/private)
|
|
7. Timing to start
|
|
|
|
### Files Created/Modified Today
|
|
- `P-Atomizer-Operating-Manual/` — 11 new docs, 5 rewrites, 19 updates
|
|
- `Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB)
|
|
- `Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md` (28KB)
|
|
- Integration plan archived to `P-Atomizer-Operating-Manual/Archive/`
|
|
|
|
### Blocker: Sub-agent Spawning
|
|
- `sessions_spawn` fails with "gateway closed (1008): pairing required" — both with `agentId=auditor` and without
|
|
- This blocks delegating work to Auditor (or any sub-agent)
|
|
- Asked Antoine for preference: self-review on Opus or wait for infra fix
|
|
- No response yet as of 7pm
|
|
|
|
### Next Steps
|
|
- Awaiting Antoine's decision on auditor review approach (self vs wait for infra)
|
|
- Antoine reviewing migration master plan
|
|
- After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)
|