Files
Atomizer/hq/workspaces/manager/memory/2026-03-23.md

35 lines
2.6 KiB
Markdown

# 2026-03-23
## Nightly Digestion — OP_11 (Incremental)
### STORE
- **Polisher-Fullum progressing:** New Implementation docs (Stochastic-Dither-Reference, Claude-Desktop-Instructions, Simulation-Physics-Reference updates) and Compliant Joint Study advancing — conical flexure NX modeling guide, COR analysis + architecture pivot, diaphragm stiffness analysis, dual diaphragm Z-block analysis. Excalidraw concept drawings created. Antoine actively developing toolhead architecture.
- **Operating Manual:** 52 files touched in last 24h (Syncthing sync — likely batch update to Operations chapters and Knowledge section).
- No new Antoine corrections to capture. No new HQ-managed project activity.
### DISCARD
- **Archived and removed** `2026-02-19.md`, `2026-02-20.md`, `2026-02-21.md` (30-31 days old). Key facts preserved in `archive/` summaries.
- Feb 22 hits 30-day threshold tomorrow — queued for next cycle.
- Feb 26-28 already covered by `archive/2026-02-26_to_2026-03-12_idle-period.md` — originals can be cleaned when they hit 30 days (Feb 22-25 first).
- No contradictions found in MEMORY.md.
- No stale TODOs.
### SORT
- Nothing to promote. Polisher-Fullum and Operating Manual remain Antoine's direct work, not HQ-managed.
- Polisher project has evolved from "concept research" to active implementation/simulation phase — noted but no MEMORY.md update needed (project description already covers this scope).
### REPAIR
- **All 7 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate, PROJECT_STATUS, OP_11 protocol)
- **All 6 agent workspaces present** ✓
- **No broken file paths in MEMORY.md** ✓
- **Taskboard:** Unchanged — ATZ-001 example only. 7 Mission Control tasks from Feb still unresolved.
- **PROJECT_STATUS.md:** Current as of Mar 22 digestion.
### EVOLVE
- **Standing OP_11 idle-mode amendment (Day 24):** No HQ-managed workspace changes for 24+ consecutive days. Antoine remains active on his own projects (Polisher-Fullum now in simulation/implementation phase, Operating Manual writing). Team ready to support when called.
- **Readiness note:** Polisher toolhead work (diaphragm flexure stiffness, conical flexure modeling, COR analysis) is exactly the kind of work Tech Lead and Optimizer could support — parametric FEA sweeps, compliance matrix analysis, joint stiffness characterization. If Antoine pulls us in, we're prepared.
- **Cron reliability:** 4 consecutive successful digestions (Mar 20-23). Gap issue from Mar 13-19 appears resolved.
### SELF-DOCUMENT
- No changes needed to MEMORY.md, SOUL.md, IDENTITY.md, AGENTS.md, or TOOLS.md — all current.