- Remove all .sync-conflict-* files - Remove temp _temp_part_properties.json files - Add USER_GUIDE.md - Add dashboard docs (Executive, Technical, Operations, Master Plan) - Add playbooks (DOE, NX_REAL_RUN, SYNCTHING_RECOVERY) - Update iteration results Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
77 lines
2.7 KiB
Markdown
77 lines
2.7 KiB
Markdown
# Hydrotech Beam — Structural Optimization
|
||
|
||
**Client:** Hydrotech (internal test fixture)
|
||
**Channel:** #project-hydrotech-beam
|
||
**Created:** 2026-02-08
|
||
**Status:** Technical Breakdown Complete — Awaiting Gap Resolution
|
||
|
||
---
|
||
|
||
## Objective
|
||
|
||
Optimize a sandwich I-beam with lightening holes: minimize mass while meeting stiffness and strength constraints.
|
||
|
||
## Key Numbers
|
||
|
||
| Metric | Baseline | Target |
|
||
|--------|----------|--------|
|
||
| Mass | ~974 kg | Minimize |
|
||
| Tip displacement | ~22 mm | ≤ 10 mm |
|
||
| Von Mises stress | TBD | ≤ 130 MPa |
|
||
|
||
## Design Variables
|
||
|
||
| Variable | Range | Type |
|
||
|----------|-------|------|
|
||
| Half-core thickness | 10–40 mm | Continuous |
|
||
| Face thickness | 10–40 mm | Continuous |
|
||
| Hole diameter | 150–450 mm | Continuous |
|
||
| Hole count | 5–15 | Integer |
|
||
|
||
## Approach
|
||
|
||
Two-phase optimization:
|
||
1. **DoE** (LHS, 40–50 trials) — map the landscape
|
||
2. **TPE** (Bayesian, 60–100 trials) — converge to optimum
|
||
|
||
Total budget: ~100–150 NX evaluations, est. 2–5 hours compute.
|
||
|
||
## Project Structure
|
||
|
||
```
|
||
hydrotech-beam/
|
||
├── README.md ← You are here
|
||
├── CONTEXT.md # Intake requirements
|
||
├── BREAKDOWN.md # Technical analysis
|
||
├── DECISIONS.md # Decision log
|
||
├── models/ # Reference NX models (golden copies)
|
||
├── kb/ # Living knowledge base
|
||
│ ├── components/ # Per-component knowledge
|
||
│ ├── materials/ # Material data
|
||
│ ├── fea/ # FEA model knowledge
|
||
│ └── dev/ # Generation documents
|
||
├── images/ # Screenshots, plots, renders
|
||
├── studies/ # Optimization campaigns
|
||
│ └── 01_doe_landscape/ # (first study — pending)
|
||
└── deliverables/ # Final reports and recommendations
|
||
```
|
||
|
||
## Key Documents
|
||
|
||
- [CONTEXT.md](CONTEXT.md) — Full intake data
|
||
- [BREAKDOWN.md](BREAKDOWN.md) — Tech Lead's technical analysis
|
||
- [DECISIONS.md](DECISIONS.md) — All project decisions
|
||
- [USER_GUIDE.md](USER_GUIDE.md) — Living user guide (operators + bots)
|
||
- [playbooks/DOE.md](playbooks/DOE.md) — DOE execution playbook
|
||
- [playbooks/NX_REAL_RUN.md](playbooks/NX_REAL_RUN.md) — Real NX run checklist
|
||
- [playbooks/SYNCTHING_RECOVERY.md](playbooks/SYNCTHING_RECOVERY.md) — Sync recovery and cleanup
|
||
- [kb/_index.md](kb/_index.md) — Knowledge base overview
|
||
|
||
## Team
|
||
|
||
| Role | Agent | Status |
|
||
|------|-------|--------|
|
||
| Manager | 🎯 Manager | Coordinating |
|
||
| Technical Lead | 🔧 Tech Lead | Breakdown complete |
|
||
| CEO | Antoine | Gap resolution pending |
|