58 lines
3.5 KiB
Markdown
58 lines
3.5 KiB
Markdown
# Project Status Dashboard
|
|
Updated: 2026-03-03 04:00 AM (Nightly Digestion OP_11)
|
|
|
|
## Active Projects
|
|
|
|
### 📦 Atomizer V2 Migration
|
|
- **Phase:** ✅ COMPLETE (2026-02-23)
|
|
- **What happened:** 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows.
|
|
- **Post-migration:** Coherence audit delivered (conditional pass, 3 critical findings fixed in preflight). V1 tagged `v1-final`, kept active for current optimizations. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work.
|
|
- **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md (docs/dev/)
|
|
- **Location:** `192.168.86.50:3000/Antoine/Atomizer-V2`, Obsidian vault `P-Atomizer-Operating-Manual/`
|
|
- **Owner:** Manager
|
|
|
|
### 🏢 Atomizer/HQ Separation
|
|
- **Phase:** ✅ COMPLETE (2026-02-23)
|
|
- **Decision:** DEC-037 — Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated. HQ repo pushed to Gitea (218 files).
|
|
- **Owner:** Manager
|
|
|
|
### 🔩 Hydrotech Beam — Optimization
|
|
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
|
|
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
|
|
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
|
|
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
|
|
- **Owner:** Tech Lead + Study Builder
|
|
|
|
### 📐 Atomizer Project Standard
|
|
- **Phase:** Review complete, awaiting CEO decision
|
|
- **Status:** 🟡 AWAITING APPROVAL
|
|
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
|
|
- **Location:** `shared/standardization/`
|
|
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
|
|
- **Owner:** Manager
|
|
|
|
### 🔺 Adaptive Isogrid Plate Lightweighting
|
|
- **Phase:** Technical spec locked, reviews complete
|
|
- **Status:** 🟡 AWAITING CEO REVIEW
|
|
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
|
|
- **Location:** `shared/war-room-isogrid/`
|
|
- **Next:** CEO review → implementation planning
|
|
- **Owner:** Manager / Tech Lead
|
|
|
|
### 🔬 Material Research (M2 Mirror Trade Study)
|
|
- **Phase:** Research complete
|
|
- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
|
|
- **Next:** Awaiting project context to produce recommendation
|
|
- **Owner:** Webster
|
|
|
|
## Outstanding Blockers
|
|
- **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (11 days — chronic, moot until CEO reviews Isogrid; closing next active session)
|
|
- **Webster** web_search API key missing (needs Mario, since Feb 19 — 8 days)
|
|
- **3 projects** simultaneously awaiting CEO input — triage needed when Antoine returns
|
|
|
|
## Recent Activity
|
|
- 2026-02-24: **Arsenal Development Plan** — Tech Lead produced dev blueprint (multi-solver expansion, 6-sprint roadmap). Auditor delivered risk analysis + quality gates (flagged 5 simultaneous problem streams, recommended phased de-risking). Good team output.
|
|
- 2026-02-23: V2 Migration COMPLETE (8 commits, 218+ files, 58 tests). HQ Separation COMPLETE (DEC-037). Coherence audit + preflight fixes delivered.
|
|
- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture
|
|
- 2026-02-18: Project standardization package assembled and reviewed
|