Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
85 lines
3.8 KiB
Markdown
85 lines
3.8 KiB
Markdown
# CONTEXT.md — Hydrotech Beam Structural Optimization
|
||
|
||
## Client
|
||
Hydrotech (internal test fixture)
|
||
|
||
## Objective
|
||
Minimize beam mass while meeting displacement and stress constraints. Single-objective: minimize mass, constrain displacement (≤ 10 mm) and stress (≤ 130 MPa).
|
||
|
||
## Key Parameters — Confirmed (Gen 002)
|
||
|
||
| Parameter | NX Expression | Current | Range | Units | DV? | Notes |
|
||
|-----------|--------------|---------|-------|-------|-----|-------|
|
||
| beam_half_core_thickness | `beam_half_core_thickness` | 20 | 10–40 | mm | Yes (DV1) | Core half-thickness |
|
||
| beam_face_thickness | `beam_face_thickness` | 20 | 10–40 | mm | Yes (DV2) | Face sheet thickness |
|
||
| holes_diameter | ❓ (Gap G14) | 300 | 150–450 | mm | Yes (DV3) | Lightening hole diameter |
|
||
| hole_count | `hole_count` | 10 | 5–15 | integer | Yes (DV4) | Number of lightening holes |
|
||
| beam_length | `beam_length` | 5,000 | Fixed | mm | No | ✅ Confirmed KBS |
|
||
| beam_half_height | `beam_half_height` | ❓ (Gap G12) | — | mm | No | Half I-beam height |
|
||
| beam_half_width | `beam_half_width` | ❓ (Gap G13) | — | mm | No | Half flange width |
|
||
| hole_span | `p6` | 4,000 | TBD | mm | Potential (G15) | Total span for hole distribution |
|
||
|
||
## Constraints
|
||
- Max tip displacement: ≤ 10 mm
|
||
- Max von Mises stress: ≤ ~130 MPa (steel, conservative — Gap G9)
|
||
- Mass tracked via NX expression **`p1`** ← CORRECTED from `p173` (Gen 002)
|
||
|
||
## Baseline Performance — Confirmed (Gen 002)
|
||
|
||
| Metric | Value | Source | Confidence |
|
||
|--------|-------|--------|------------|
|
||
| Mass | **11.33 kg** | NX expression `p1`, KBS session | ✅ High |
|
||
| Tip displacement | ❓ **NEEDS RE-VERIFICATION** (Gap G10) | Was 22 mm at old model state | ⚠️ Low |
|
||
| Max stress | ❓ **NEVER MEASURED** (Gap G11) | — | ❌ None |
|
||
| Material | **AISI Steel 1005** | KBS session | ✅ High |
|
||
| Density | **7.3 g/cm³** | KBS session | ✅ High |
|
||
|
||
> ⚠️ **Mass discrepancy resolved:** Intake reported ~974 kg (`p173`). KBS session confirmed 11.33 kg (`p1`). See `kb/dev/gen-002.md` for full analysis.
|
||
|
||
## Boundary Conditions — Confirmed (Gen 002)
|
||
|
||
| BC | Location | Value | Source |
|
||
|----|----------|-------|--------|
|
||
| Fixed support | Left side (full edge) | All DOF constrained | ✅ KBS session |
|
||
| Applied force | Right side (free end) | 10,000 kgf downward (−Y) | ✅ KBS session — "project requirement" |
|
||
| Configuration | Cantilever | Left fixed, right loaded | ✅ KBS session |
|
||
|
||
## Mesh — Confirmed (Gen 002)
|
||
|
||
| Property | Value | Source |
|
||
|----------|-------|--------|
|
||
| Element type | CQUAD4 (thin shell) | ✅ KBS session |
|
||
| Element size | 33.7 mm (67.4/2) | ✅ KBS session |
|
||
| Idealization | Promote body → mid-surface extraction | ✅ KBS session |
|
||
|
||
## Hole Geometry — Confirmed (Gen 002)
|
||
|
||
| Property | Value | Notes |
|
||
|----------|-------|-------|
|
||
| Span | 4,000 mm (expression `p6`) | Total distribution length |
|
||
| Start offset | 500 mm from beam start | Fixed requirement — not parametric |
|
||
| End offset | 500 mm from beam end | Fixed requirement — not parametric |
|
||
| Collision check | Required at DV extremes | 15 × 450 mm in 4,000 mm → overlap |
|
||
|
||
## Model Files
|
||
- NX Part: `Beam.prt`
|
||
- FEM: `Beam_fem1.fem`
|
||
- Idealized part: `Beam_fem1_i.prt`
|
||
- Simulation: `Beam_sim1.sim`
|
||
- Solver: NX Nastran SOL 101 (static structural)
|
||
|
||
## Future Expansion
|
||
- Material alternatives: Aluminum 6061, Stainless Steel ANSI 310 (per Antoine, KBS session)
|
||
- `p6` (hole span) as additional design variable (pending decision)
|
||
- Mesh refinement (Antoine: "Eventually we're going to be able to refine the element size")
|
||
|
||
## Decisions
|
||
- 2026-02-08: Project received from Antoine
|
||
- 2026-02-10: KBS sessions processed → Gen 002 KB update. Mass corrected, BCs confirmed.
|
||
|
||
## Status
|
||
Phase: Pre-optimization (baseline re-verification needed)
|
||
Generation: 002
|
||
Channel: #project-hydrotech-beam
|
||
Last KBS session: 2026-02-10T16:38:01
|