Files
Atomizer/projects/hydrotech-beam/CONTEXT.md
Antoine b88657b00c KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)

Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6

Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
       kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00

85 lines
3.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# CONTEXT.md — Hydrotech Beam Structural Optimization
## Client
Hydrotech (internal test fixture)
## Objective
Minimize beam mass while meeting displacement and stress constraints. Single-objective: minimize mass, constrain displacement (≤ 10 mm) and stress (≤ 130 MPa).
## Key Parameters — Confirmed (Gen 002)
| Parameter | NX Expression | Current | Range | Units | DV? | Notes |
|-----------|--------------|---------|-------|-------|-----|-------|
| beam_half_core_thickness | `beam_half_core_thickness` | 20 | 1040 | mm | Yes (DV1) | Core half-thickness |
| beam_face_thickness | `beam_face_thickness` | 20 | 1040 | mm | Yes (DV2) | Face sheet thickness |
| holes_diameter | ❓ (Gap G14) | 300 | 150450 | mm | Yes (DV3) | Lightening hole diameter |
| hole_count | `hole_count` | 10 | 515 | integer | Yes (DV4) | Number of lightening holes |
| beam_length | `beam_length` | 5,000 | Fixed | mm | No | ✅ Confirmed KBS |
| beam_half_height | `beam_half_height` | ❓ (Gap G12) | — | mm | No | Half I-beam height |
| beam_half_width | `beam_half_width` | ❓ (Gap G13) | — | mm | No | Half flange width |
| hole_span | `p6` | 4,000 | TBD | mm | Potential (G15) | Total span for hole distribution |
## Constraints
- Max tip displacement: ≤ 10 mm
- Max von Mises stress: ≤ ~130 MPa (steel, conservative — Gap G9)
- Mass tracked via NX expression **`p1`** ← CORRECTED from `p173` (Gen 002)
## Baseline Performance — Confirmed (Gen 002)
| Metric | Value | Source | Confidence |
|--------|-------|--------|------------|
| Mass | **11.33 kg** | NX expression `p1`, KBS session | ✅ High |
| Tip displacement | ❓ **NEEDS RE-VERIFICATION** (Gap G10) | Was 22 mm at old model state | ⚠️ Low |
| Max stress | ❓ **NEVER MEASURED** (Gap G11) | — | ❌ None |
| Material | **AISI Steel 1005** | KBS session | ✅ High |
| Density | **7.3 g/cm³** | KBS session | ✅ High |
> ⚠️ **Mass discrepancy resolved:** Intake reported ~974 kg (`p173`). KBS session confirmed 11.33 kg (`p1`). See `kb/dev/gen-002.md` for full analysis.
## Boundary Conditions — Confirmed (Gen 002)
| BC | Location | Value | Source |
|----|----------|-------|--------|
| Fixed support | Left side (full edge) | All DOF constrained | ✅ KBS session |
| Applied force | Right side (free end) | 10,000 kgf downward (Y) | ✅ KBS session — "project requirement" |
| Configuration | Cantilever | Left fixed, right loaded | ✅ KBS session |
## Mesh — Confirmed (Gen 002)
| Property | Value | Source |
|----------|-------|--------|
| Element type | CQUAD4 (thin shell) | ✅ KBS session |
| Element size | 33.7 mm (67.4/2) | ✅ KBS session |
| Idealization | Promote body → mid-surface extraction | ✅ KBS session |
## Hole Geometry — Confirmed (Gen 002)
| Property | Value | Notes |
|----------|-------|-------|
| Span | 4,000 mm (expression `p6`) | Total distribution length |
| Start offset | 500 mm from beam start | Fixed requirement — not parametric |
| End offset | 500 mm from beam end | Fixed requirement — not parametric |
| Collision check | Required at DV extremes | 15 × 450 mm in 4,000 mm → overlap |
## Model Files
- NX Part: `Beam.prt`
- FEM: `Beam_fem1.fem`
- Idealized part: `Beam_fem1_i.prt`
- Simulation: `Beam_sim1.sim`
- Solver: NX Nastran SOL 101 (static structural)
## Future Expansion
- Material alternatives: Aluminum 6061, Stainless Steel ANSI 310 (per Antoine, KBS session)
- `p6` (hole span) as additional design variable (pending decision)
- Mesh refinement (Antoine: "Eventually we're going to be able to refine the element size")
## Decisions
- 2026-02-08: Project received from Antoine
- 2026-02-10: KBS sessions processed → Gen 002 KB update. Mass corrected, BCs confirmed.
## Status
Phase: Pre-optimization (baseline re-verification needed)
Generation: 002
Channel: #project-hydrotech-beam
Last KBS session: 2026-02-10T16:38:01