"schemaVersion": "1.1",
"runId": "orch-1771264616-aea2c906",
"agent": "tech-lead",
"status": "complete",
"result": "CEO decision logged: 7075-T6 selected for lightweight bracket, prioritizing structural performance.\n\n**Project docs created:**\n- `/home/papa/atomizer/hq/projects/lightweight-bracket/CONTEXT.md` — full project context with material decision, properties, and design plan\n\n**Next design phase plan (4 phases):**\n\n1. **Requirements & Baseline** — Define load cases, geometric envelope, performance targets, create baseline CAD. This is the immediate next step and requires input from CEO/Manager on loads, constraints, and function.\n\n2. **FEA Baseline Analysis** — Mesh convergence study, SOL 101 static + SOL 103 modal, hand-calc validation.\n\n3. **Design Optimization** — Topology/parametric optimization via Atomizer LAC pattern. Minimize mass subject to stress and displacement constraints.\n\n4. **Validation & Deliverables** — Final mesh convergence, margin of safety report, fatigue assessment if needed, ductility check (7075-T6 at 11% elongation).\n\n**7 open gaps identified** (G1G7) — all related to missing requirements (loads, geometry, manufacturing, FOS). These must be resolved before Phase 2 can begin.\n\n**Immediate action needed:** CEO/Manager to provide bracket function, load cases, and geometric envelope to proceed past Phase 1.",
"deliverable": {
"type": "document",
"title": "Lightweight Bracket Project Context & Design Plan",
"path": "/home/papa/atomizer/hq/projects/lightweight-bracket/CONTEXT.md",
"summary": "Project context documenting 7075-T6 selection and 4-phase design/analysis plan with 7 open gaps"
},
"artifacts": [
"/home/papa/atomizer/hq/projects/lightweight-bracket/CONTEXT.md"
],
"confidence": "high",
"notes": "Design plan is well-defined but all 7 requirement gaps (G1-G7) must be closed before FEA work can begin. The plan accounts for 7075-T6's lower ductility as a validation checkpoint.",
"timestamp": "2026-02-16T12:56:30-05:00"
}