chore(hq): daily sync 2026-02-23

This commit is contained in:
2026-02-23 10:00:17 +00:00
parent 31d21ec551
commit 1f58bb8016
7 changed files with 661 additions and 10 deletions

View File

@@ -1,8 +1,17 @@
# Project Status Dashboard
Updated: 2026-02-20 04:00 AM (Nightly Digestion OP_11)
Updated: 2026-02-23 04:00 AM (Nightly Digestion OP_11)
## Active Projects
### 📦 AOM / V2 Migration (NEW — Feb 22)
- **Phase:** Documentation complete, migration plan reviewed
- **Status:** 🟡 AWAITING CEO DECISIONS (6 items)
- **What happened:** AOM completed (48 docs, ~8,830 lines, zero NX-only assumptions). Tool-agnostic architecture approved (DEC-030). V2 repo created at `192.168.86.50:3000/Antoine/Atomizer-V2` (DEC-032). Migration masterplan written + audited (11 findings addressed in V2 plan, 12-day timeline).
- **Deliverables ready:** AOM (Obsidian), V2 Migration Masterplan V2, Auditor audit, code review
- **Location:** Obsidian vault `P-Atomizer-Operating-Manual/`, `shared/reviews/`
- **Pending CEO decisions:** License type, GitHub name, Obsidian sync strategy, HQ separation, projects/ exclusion, repo visibility, timing to start
- **Owner:** Manager
### 🔩 Hydrotech Beam — Optimization
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
@@ -33,11 +42,13 @@ Updated: 2026-02-20 04:00 AM (Nightly Digestion OP_11)
- **Next:** Awaiting project context to produce recommendation
- **Owner:** Webster
## Pending Items
- Auditor blocked on P-Adaptive-Isogrid review (needs Tech Lead response since Feb 16)
- Secretary TASK-002 delivery failed (Slack token issue) — resolved via TASK-004
## Outstanding Blockers
- **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (needs Tech Lead response)
- **Webster** web_search API key missing (needs Mario, since Feb 19)
- **Sub-agent spawning** intermittently broken ("pairing required" error, Feb 22)
- **4 projects** simultaneously awaiting CEO input — triage needed
## Recent Completions (last 7 days)
## Recent Completions
- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture, V2 migration plan + audit
- 2026-02-18: Project standardization package assembled and reviewed
- 2026-02-19: Auditor spec audit completed
- 2026-02-17: System test orchestration validated (TASK-001 through TASK-004)
- 2026-02-17: System test orchestration validated