chore(hq): daily sync 2026-04-02

This commit is contained in:
2026-04-02 09:00:44 +00:00
parent b45896a391
commit 339754ca3c
10 changed files with 150 additions and 188 deletions

View File

@@ -25,10 +25,10 @@ All Atomizer HQ planning docs are in `context-docs/`:
Read these on first session to fully understand the vision and architecture.
## Active Projects
- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`.
- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/`.
- **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`.
- **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.**
- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.**
- **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.**
- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.**
- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on Polisher/GigaBIT now.
- **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review.
- **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach.