chore(hq): daily sync 2026-03-20

This commit is contained in:
2026-03-20 09:00:26 +00:00
parent f14cbfd6aa
commit 4d09ce2a2e
8 changed files with 134 additions and 100 deletions

View File

@@ -0,0 +1,41 @@
# 2026-03-20
## Nightly Digestion — OP_11 (Incremental/Weekly)
**Note:** 8-day gap since last digestion (Mar 12). No nightly logs exist for Mar 1319 — likely cron delivery issue or gateway downtime during that period.
### STORE
- **NEW PROJECT DISCOVERED:** GigaBIT M1 — Reference Frame Stiffness Characterization (P04-GigaBIT-M1). Client: StarSpec (Adyn Miles). Active since Mar 4. Antoine working directly on this. Hybrid B+D method, SOL 101, ~42 runs. ΔWFE ≤1.0 nm RMS budget.
- **Zernike V&V COMPLETE:** P-Zernike-Validation finished Mar 9. 18 test cases, prysm cross-validation to machine precision. Risk reduction for M2/M3 ordering. Commits `f9373be`, `075ad36`.
- **Tier 2 dev workflow:** Windows test runner + Syncthing result sync added Mar 7 (commit `b3162aa`).
- Updated MEMORY.md with new projects and reprioritized project list.
- Updated PROJECT_STATUS.md (was stale since Mar 3 — now current).
### DISCARD
- **Archived** `2026-02-11.md` and `2026-02-13.md` (37+ days old). Key facts preserved in archive summaries.
- **Compressed 15 idle-only daily logs** (Feb 26 Mar 12) into single archive summary (`archive/2026-02-26_to_2026-03-12_idle-period.md`). These contained only digestion-cycle boilerplate with zero substantive activity. Originals retained (not yet 30 days) but archive summary created for when they age out.
- Feb 19 hits 30-day threshold tomorrow — queued for next cycle.
### SORT
- GigaBIT M1 promoted to top of Active Projects in MEMORY.md (it's where Antoine is spending time).
- Hydrotech Beam deprioritized with note that Antoine is focused on GigaBIT now.
- Zernike V&V logged as completed project with cross-references.
### REPAIR
- **All 12 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate tools, MCP server, protocols)
- **All 7 agent workspaces present** ✓
- **Mission Control dashboard** responding (HTTP 200) ✓
- **PROJECT_STATUS.md was 17 days stale** (last updated Mar 3) — now updated with GigaBIT M1 and current state.
- **7 Mission Control tasks stuck** in `in_progress` or `review` since mid-February — flagged for cleanup when Antoine returns to HQ work.
- **Gap identified:** Mar 1319 digestion logs missing. Cron job may have had delivery issues or gateway was down. No data loss — just missing the nightly check-ins.
### EVOLVE
- **Standing OP_11 amendment proposal** (since Mar 8, now 12 days): idle-mode rule for weekly-only digestion when no workspace changes for 7+ days. Requires CEO approval.
- **Observation:** Antoine is doing significant direct work (GigaBIT M1, Zernike V&V, dev workflow) without HQ agent involvement. The team may need to be more proactive about supporting active client work vs. waiting to be tasked.
- **Recommendation:** When Antoine next engages HQ, offer GigaBIT M1 support (Tech Lead for sensitivity analysis, Optimizer for stiffness sweep design, Webster for literature on mirror mount compliance requirements).
### SELF-DOCUMENT
- MEMORY.md updated with GigaBIT M1 project, Zernike V&V completion, and reprioritized project list.
- PROJECT_STATUS.md fully refreshed (was 17 days stale).
- No changes needed to SOUL.md, IDENTITY.md, or TOOLS.md — all still accurate.
- Agent workspace docs (other agents) not checked this cycle — no activity detected in their workspaces.