Project Status Dashboard
Updated: 2026-04-02 04:00 AM (Nightly Digestion OP_11)
Active Projects
🔭 GigaBIT M1 — Reference Frame Stiffness Characterization
- Phase: Active — Model Setup
- Client: StarSpec (Adyn Miles)
- Project ID: P04-GigaBIT-M1
- Created: 2026-03-04
- Objective: Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance.
- Method: Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total
- Key numbers: ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS
- Location:
/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/ - PKM:
/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/ - Owner: Antoine (direct)
✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction)
- Phase: ✅ COMPLETE (2026-03-09)
- What: Zernike pipeline V&V — 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm)
- Commits:
f9373be(round-trip validation),075ad36(prysm cross-validation + report figures) - Requested by: Adyn Miles (StarSpec) for risk reduction before M2/M3 ordering
- Owner: Antoine (direct)
🔩 Hydrotech Beam — Optimization
- Phase: DOE Phase 1 complete, awaiting Phase 2 (TPE)
- Status: ⏸️ BLOCKED — Mass NaN fix committed (
580ed65), needs pull + test on dalidou - Key numbers: 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- Next: Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- Note: Lower priority — Antoine focused on GigaBIT M1 work
- Owner: Tech Lead + Study Builder
📐 Atomizer Project Standard
- Phase: Review complete, awaiting CEO decision
- Status: 🟡 AWAITING APPROVAL
- Deliverables ready: Full spec, tech-lead review, auditor audit, secretary synthesis
- Location:
/home/papa/atomizer/workspaces/shared/standardization/ - Key decision: Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- Owner: Manager
🔺 Adaptive Isogrid Plate Lightweighting
- Phase: Technical spec locked, reviews complete
- Status: 🟡 AWAITING CEO REVIEW
- Deliverables ready: Full technical spec (32KB), optimizer review, tech-lead review, webster review
- Location:
/home/papa/atomizer/workspaces/shared/war-room-isogrid/ - Next: CEO review → implementation planning
- Owner: Manager / Tech Lead
📦 Atomizer V2 Migration
- Phase: ✅ COMPLETE (2026-02-23)
- Post-migration: V1 tagged
v1-final, kept active. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work. - Remaining roadmap: Items 4-9 in ROADMAP-NEXT.md
🏢 Atomizer/HQ Separation
- Phase: ✅ COMPLETE (2026-02-23)
- Decision: DEC-037
Infrastructure Updates
- Tier 2 dev workflow added (2026-03-07, commit
b3162aa): Windows test runner (run_tests.bat), result sync via Syncthing, JSON result capture,--quickmode for NX-independent tests - Daily HQ syncs continue (automated commits through Mar 12)
Outstanding Blockers
- 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid) — deprioritized while Antoine focuses on GigaBIT M1
- No newly verified infrastructure blockers during this digestion pass; prior Webster search-tool/API-key issue appears historical and should only be reinstated if it reproduces
Mission Control — Stale Tasks
Several MC tasks have been in in_progress or review since mid-February with no updates:
- ATZ-2f1634: P-Adaptive-Isogrid (in_progress)
- ATZ-74f02a: Atomizer Overhaul (in_progress)
- ATZ-839392: Project Standard — Introspection (in_progress)
- ATZ-749aac, ATZ-d3fce9, ATZ-05c017, ATZ-21695d: all in review These should be resolved (completed or closed) when Antoine returns to HQ work.