Files
Atomizer/hq/workspaces/shared/PROJECT_STATUS.md

73 lines
3.9 KiB
Markdown

# Project Status Dashboard
Updated: 2026-04-02 04:00 AM (Nightly Digestion OP_11)
## Active Projects
### 🔭 GigaBIT M1 — Reference Frame Stiffness Characterization
- **Phase:** Active — Model Setup
- **Client:** StarSpec (Adyn Miles)
- **Project ID:** P04-GigaBIT-M1
- **Created:** 2026-03-04
- **Objective:** Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance.
- **Method:** Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total
- **Key numbers:** ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS
- **Location:** `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/`
- **PKM:** `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/`
- **Owner:** Antoine (direct)
### ✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction)
- **Phase:** ✅ COMPLETE (2026-03-09)
- **What:** Zernike pipeline V&V — 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm)
- **Commits:** `f9373be` (round-trip validation), `075ad36` (prysm cross-validation + report figures)
- **Requested by:** Adyn Miles (StarSpec) for risk reduction before M2/M3 ordering
- **Owner:** Antoine (direct)
### 🔩 Hydrotech Beam — Optimization
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- **Note:** Lower priority — Antoine focused on GigaBIT M1 work
- **Owner:** Tech Lead + Study Builder
### 📐 Atomizer Project Standard
- **Phase:** Review complete, awaiting CEO decision
- **Status:** 🟡 AWAITING APPROVAL
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
- **Location:** `/home/papa/atomizer/workspaces/shared/standardization/`
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- **Owner:** Manager
### 🔺 Adaptive Isogrid Plate Lightweighting
- **Phase:** Technical spec locked, reviews complete
- **Status:** 🟡 AWAITING CEO REVIEW
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
- **Location:** `/home/papa/atomizer/workspaces/shared/war-room-isogrid/`
- **Next:** CEO review → implementation planning
- **Owner:** Manager / Tech Lead
### 📦 Atomizer V2 Migration
- **Phase:** ✅ COMPLETE (2026-02-23)
- **Post-migration:** V1 tagged `v1-final`, kept active. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work.
- **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md
### 🏢 Atomizer/HQ Separation
- **Phase:** ✅ COMPLETE (2026-02-23)
- **Decision:** DEC-037
## Infrastructure Updates
- **Tier 2 dev workflow** added (2026-03-07, commit `b3162aa`): Windows test runner (`run_tests.bat`), result sync via Syncthing, JSON result capture, `--quick` mode for NX-independent tests
- **Daily HQ syncs** continue (automated commits through Mar 12)
## Outstanding Blockers
- **3 projects** awaiting CEO input (Hydrotech, Project Standard, Isogrid) — deprioritized while Antoine focuses on GigaBIT M1
- No newly verified infrastructure blockers during this digestion pass; prior Webster search-tool/API-key issue appears historical and should only be reinstated if it reproduces
## Mission Control — Stale Tasks
Several MC tasks have been in `in_progress` or `review` since mid-February with no updates:
- ATZ-2f1634: P-Adaptive-Isogrid (in_progress)
- ATZ-74f02a: Atomizer Overhaul (in_progress)
- ATZ-839392: Project Standard — Introspection (in_progress)
- ATZ-749aac, ATZ-d3fce9, ATZ-05c017, ATZ-21695d: all in review
These should be resolved (completed or closed) when Antoine returns to HQ work.