chore(hq): daily sync 2026-04-02

This commit is contained in:
2026-04-02 09:00:44 +00:00
parent b45896a391
commit 339754ca3c
10 changed files with 150 additions and 188 deletions

View File

@@ -100,6 +100,41 @@
"text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.", "text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.",
"timestamp": "2026-04-01T08:44:12.763086+00:00", "timestamp": "2026-04-01T08:44:12.763086+00:00",
"author": "manager" "author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still no new dashboard movement. Please confirm owner, next step, or move task to the correct status.",
"timestamp": "2026-04-01T10:29:40.520185+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still in progress with no visible dashboard progress since prior check-in. Needs owner response, next action, or status correction.",
"timestamp": "2026-04-01T12:50:16.344124+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still stale after another 2+ hours. Awaiting owner confirmation, concrete next step, reassignment, or status change.",
"timestamp": "2026-04-01T15:10:59.087451+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: task remains stale beyond another 2-hour window. Needs assignee acknowledgement, next action, reassignment, or closure/status correction.",
"timestamp": "2026-04-01T17:31:43.637014+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hours elapsed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.",
"timestamp": "2026-04-01T20:27:28.277069+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hour interval passed with no dashboard movement. Needs assignee acknowledgement, specific next step, reassignment, or status correction.",
"timestamp": "2026-04-01T23:23:16.895722+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hours passed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.",
"timestamp": "2026-04-02T03:29:30.263346+00:00",
"author": "manager"
} }
] ]
}, },
@@ -237,6 +272,41 @@
"text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.", "text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.",
"timestamp": "2026-04-01T08:44:12.763086+00:00", "timestamp": "2026-04-01T08:44:12.763086+00:00",
"author": "manager" "author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still no new dashboard movement. Please confirm owner, next step, or move task to the correct status.",
"timestamp": "2026-04-01T10:29:40.520185+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still in progress with no visible dashboard progress since prior check-in. Needs owner response, next action, or status correction.",
"timestamp": "2026-04-01T12:50:16.344124+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: still stale after another 2+ hours. Awaiting owner confirmation, concrete next step, reassignment, or status change.",
"timestamp": "2026-04-01T15:10:59.087451+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: task remains stale beyond another 2-hour window. Needs assignee acknowledgement, next action, reassignment, or closure/status correction.",
"timestamp": "2026-04-01T17:31:43.637014+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hours elapsed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.",
"timestamp": "2026-04-01T20:27:28.277069+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hour interval passed with no dashboard movement. Needs assignee acknowledgement, specific next step, reassignment, or status correction.",
"timestamp": "2026-04-01T23:23:16.895722+00:00",
"author": "manager"
},
{
"text": "Heartbeat follow-up by Manager: another 2+ hours passed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.",
"timestamp": "2026-04-02T03:29:30.263346+00:00",
"author": "manager"
} }
] ]
}, },

View File

@@ -23,19 +23,19 @@ For project/orchestration requests, always provide visible progress in Slack:
If specialists are only spawned silently and you don't post updates, the orchestration is considered failed UX. If specialists are only spawned silently and you don't post updates, the orchestration is considered failed UX.
### Gatekeeper: PROJECT_STATUS.md ### Gatekeeper: PROJECT_STATUS.md
**You are the sole writer of `shared/PROJECT_STATUS.md`.** Other agents must NOT directly edit this file. **You are the sole writer of `/home/papa/atomizer/workspaces/shared/PROJECT_STATUS.md`.** Other agents must NOT directly edit this file.
- Other agents report status by appending to `shared/project_log.md` (append-only) - Other agents report status by appending to `/home/papa/atomizer/workspaces/shared/project_log.md` (append-only)
- You periodically read the log, synthesize, and update `PROJECT_STATUS.md` - You periodically read the log, synthesize, and update `PROJECT_STATUS.md`
- This prevents conflicts and ensures a single source of truth - This prevents conflicts and ensures a single source of truth
### 📋 Taskboard Orchestration Protocol (PRIMARY WORKFLOW) ### 📋 Taskboard Orchestration Protocol (PRIMARY WORKFLOW)
You are the **sole owner** of the taskboard. You are the **sole owner** of the taskboard.
**Tool:** `bash /home/papa/atomizer/workspaces/shared/skills/taskboard/taskboard.sh` **Tool:** `/home/papa/atomizer/workspaces/shared/skills/taskboard/taskboard.sh`
**Docs:** `shared/skills/taskboard/SKILL.md` **Docs:** `/home/papa/atomizer/workspaces/shared/skills/taskboard/SKILL.md`
#### Workflow (MUST follow for every orchestration): #### Workflow (MUST follow for every orchestration):
1. **Plan** — log objective + assignments in `shared/orchestration-log.md` 1. **Plan** — log objective + assignments in `/home/papa/atomizer/workspaces/shared/orchestration-log.md`
2. **Create tasks** on taskboard (one task per specialist output) 2. **Create tasks** on taskboard (one task per specialist output)
3. **Delegate via sessions_spawn** (include task ID + expected output format) 3. **Delegate via sessions_spawn** (include task ID + expected output format)
4. **Monitor** (taskboard + project_log.md) 4. **Monitor** (taskboard + project_log.md)
@@ -53,7 +53,7 @@ You are the **sole owner** of the taskboard.
| data | #knowledge-base | | data | #knowledge-base |
### Rules ### Rules
- Read `shared/CLUSTER.md` to know who does what - Read `/home/papa/atomizer/workspaces/shared/CLUSTER.md` to know who does what
- Delegate with explicit scope, deadline, and output format - Delegate with explicit scope, deadline, and output format
- Post results back in the originating Slack thread/channel - Post results back in the originating Slack thread/channel

View File

@@ -25,10 +25,10 @@ All Atomizer HQ planning docs are in `context-docs/`:
Read these on first session to fully understand the vision and architecture. Read these on first session to fully understand the vision and architecture.
## Active Projects ## Active Projects
- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`. - **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/`.
- **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`. - **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`.
- **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.** - **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.**
- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.** - **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.**
- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on Polisher/GigaBIT now. - **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on Polisher/GigaBIT now.
- **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review. - **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review.
- **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach. - **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach.

View File

@@ -1,95 +0,0 @@
# 2026-02-22
## Nightly Digestion — OP_11 (Incremental)
### STORE
- New artifact: `MIND_MAP_AUDIT.md` (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality.
- No new Antoine corrections. No new project activity. Weekend quiet period continues.
### DISCARD
- Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention
- **Flagged:** Tech Lead has 2 legacy files from 2025 (`2025-02-09.md`, `2025-07-17.md`) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion.
- No contradictions found in current memory files
- No stale TODOs — all 3 active projects genuinely awaiting CEO input
### SORT
- MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note)
- No patterns to promote — quiet weekend
### REPAIR
- PROJECT_STATUS.md still accurate — no state changes since Feb 20
- MEMORY.md still accurate
- All key paths verified: `shared/standardization/`, `shared/war-room-isogrid/`, `shared/war-room-overhaul/` intact
- Outstanding blockers unchanged:
- Hydrotech Beam: blocked on Antoine (dalidou pull + test)
- Project Standard: awaiting CEO decision (full spec vs MVS)
- Adaptive Isogrid: awaiting CEO review
- Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved
- Webster web_search API key: still needs Mario
### EVOLVE
- No process issues this cycle
- Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck.
- MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase
### SELF-DOCUMENT
- No changes needed — docs current
---
## AOM Project — MASSIVE Session (afternoon)
### What Happened
Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering:
1. **AOM Phase 3 completed** — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines).
2. **Phase 4 (LLM Layer) completed** — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module.
3. **Phase 5 (Living Protocol) completed** — maintenance rules, update triggers, health checks, ownership model.
4. **Tool-Agnostic Architecture Plan** — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote `ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure.
5. **AOM V2 Integration** — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases:
- Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference)
- Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap)
- Phase C: 19 surgical updates across all pillars
- Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev)
- Phase E: MAP + final updates
**Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.**
6. **V2 Migration Master Plan** — Antoine confirmed new repo at `http://192.168.86.50:3000/Antoine/Atomizer-V2` (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy.
### Key Decisions Made (by Antoine)
- DEC-030: Tool-agnostic architecture approved
- DEC-032: New repo (V2) instead of cleaning V1
- DEC-033: Documentation-first — AOM before code
- DEC-021: AOM stays in Obsidian until migration
- V2 Gitea repo created at `192.168.86.50:3000/Antoine/Atomizer-V2`
### CEO Decisions Still Pending (for migration)
1. License type (Apache 2.0 / MIT)
2. GitHub repo name
3. Obsidian ↔ repo sync strategy
4. HQ separation (in V2 or separate?)
5. Confirm projects/ stays off git
6. GitHub visibility (public/private)
7. Timing to start
### Files Created/Modified Today
- `P-Atomizer-Operating-Manual/` — 11 new docs, 5 rewrites, 19 updates
- `Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB)
- `Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md` (28KB)
- Integration plan archived to `P-Atomizer-Operating-Manual/Archive/`
### Blocker: Sub-agent Spawning
- `sessions_spawn` fails with "gateway closed (1008): pairing required" — both with `agentId=auditor` and without
- This blocks delegating work to Auditor (or any sub-agent)
- Asked Antoine for preference: self-review on Opus or wait for infra fix
- No response yet as of 7pm
### Next Steps
- Awaiting Antoine's decision on auditor review approach (self vs wait for infra)
- Antoine reviewing migration master plan
- After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)

View File

@@ -1,27 +0,0 @@
# 2026-02-26
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Feb 25 digestion. Zero new files modified.
- No CEO corrections or new directives to capture.
### DISCARD
- Oldest memory file: Feb 8 (18 days) — within 30-day retention, no pruning needed.
- No contradictions found. MEMORY.md accurate.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- PROJECT_STATUS.md: updated timestamp, incremented blocker ages (Auditor 10 days, Webster 7 days).
- All file paths verified — no broken references.
- **Recommendation:** Auditor Isogrid blocker at 10 days should be closed — Isogrid project itself is awaiting CEO review, so Auditor review is moot until Antoine decides direction. Will close on next active session.
### EVOLVE
- Team fully idle — 3 projects blocked on CEO input, no new work initiated.
- No process changes needed.
### SELF-DOCUMENT
- PROJECT_STATUS.md updated (blocker ages, timestamp).
- No other changes needed.

View File

@@ -1,26 +0,0 @@
# 2026-02-27
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Feb 26. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (19 days) — within 30-day retention, no pruning needed.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- PROJECT_STATUS.md: updated timestamp, incremented blocker ages (Auditor 11 days, Webster 8 days).
- All file paths verified — no broken references.
### EVOLVE
- Team fully idle — 3 projects blocked on CEO input, no new work initiated.
- Day 4 of zero activity. No process changes needed.
### SELF-DOCUMENT
- PROJECT_STATUS.md updated (blocker ages, timestamp).
- No other changes needed.

View File

@@ -1,26 +0,0 @@
# 2026-02-28
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity across any agent workspace since Feb 27. Zero modified files detected.
- No CEO corrections or new directives.
### DISCARD
- Oldest memory file: Feb 8 (20 days) — within 30-day retention, no pruning needed.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- PROJECT_STATUS.md: updated timestamp. Blocker ages: Auditor idle 12 days, Webster idle 9 days.
- All file paths verified — no broken references.
### EVOLVE
- Day 5 of zero activity. 3 projects blocked on CEO input (Hydrotech, Project Standard, Isogrid).
- No process changes needed — team is ready, waiting on directives.
### SELF-DOCUMENT
- PROJECT_STATUS.md timestamp updated.
- No other changes needed.

View File

@@ -0,0 +1,35 @@
# 2026-04-02
## Nightly Digestion — OP_11 (Incremental)
### STORE
- Reviewed the last ~36 hours of activity across manager/shared workspace surfaces.
- Confirmed there was still no new specialist project output to promote into long-term memory or project knowledge.
- Preserved the only still-relevant signal from four stale February daily notes by compressing them into `memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md`.
### DISCARD
- Pruned four stale manager daily notes past retention threshold: `2026-02-22.md`, `2026-02-26.md`, `2026-02-27.md`, `2026-02-28.md`.
- Identified repetitive stale-task heartbeat comments accumulating in mission-control data on Apr 1; treated this as operational noise rather than new knowledge.
- No new factual contradictions found in active manager memory.
### SORT
- Kept the Feb 22 AOM/V2 migration session as archive-level historical context, since the enduring decisions already live in higher-level memory/docs.
- Left current project facts in `MEMORY.md` and `shared/PROJECT_STATUS.md`, but repaired their path references so they resolve correctly.
### REPAIR
- Fixed broken path references in live docs:
- `manager/MEMORY.md`
- `shared/PROJECT_STATUS.md`
- `manager/AGENTS.md`
- Refreshed `shared/PROJECT_STATUS.md` timestamp for this digestion pass.
- Verified key referenced paths now resolve correctly for current workspace usage.
### EVOLVE
- Reconfirmed the idle-noise pattern: repeated stale-task nudges can bloat mission-control history without adding decision value.
- Proposed operational improvement remains the same in spirit: reduce OP_11 noise during long idle windows and batch stale-task follow-ups rather than posting near-duplicate comments.
- No protocol change applied automatically; this is an operational observation, not a silent policy rewrite.
### SELF-DOCUMENT
- Added this nightly digestion note.
- Updated path hygiene in active docs so a new agent can follow references without guessing workspace-relative roots.
- No role/persona/tooling changes needed tonight.

View File

@@ -0,0 +1,31 @@
# 2026-02-22 to 2026-02-28 — Archived Digestion Summary
## Why archived
These daily notes were older than the 30-day active-memory retention window. They covered one major AOM/migration planning session plus several repetitive idle digestion passes.
## Key retained signal
### 2026-02-22 — High-value session
- Antoine reviewed AOM status and drove a major documentation push.
- AOM Phase 3, 4, and 5 were completed that day, including digestion/context-engineering material and maintenance rules.
- Atomizer was explicitly moved toward a tool-agnostic architecture.
- V2 migration direction was established: new V2 repo, documentation-first, Obsidian remains source during transition.
- Key recorded decisions from that session:
- DEC-030: tool-agnostic architecture approved
- DEC-032: create new V2 repo instead of cleaning V1
- DEC-033: documentation first, code later
- DEC-021: AOM stays in Obsidian until migration
- At that time, `sessions_spawn` was blocked by pairing issues; delegation reliability was an active infrastructure concern.
### 2026-02-26 to 2026-02-28 — Repetitive idle digestion
- No new agent activity across HQ workspaces.
- Core projects remained blocked on CEO input.
- Repeated nightly notes mainly updated timestamps/blocker ages without adding new knowledge.
## What was intentionally not retained verbatim
- Repetitive "no activity" nightly entries from Feb 2628.
- Daily timestamp-only updates already superseded by higher-level memory and project status docs.
## Persistent lessons preserved elsewhere
- Idle digestion can create low-value repetition; cadence/idle-mode tuning remains a candidate OP_11 improvement pending CEO approval.
- Project bottlenecks were mostly decision/approval bound, not execution bound.

View File

@@ -1,5 +1,5 @@
# Project Status Dashboard # Project Status Dashboard
Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11) Updated: 2026-04-02 04:00 AM (Nightly Digestion OP_11)
## Active Projects ## Active Projects
@@ -11,8 +11,8 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11)
- **Objective:** Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance. - **Objective:** Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance.
- **Method:** Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total - **Method:** Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total
- **Key numbers:** ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS - **Key numbers:** ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS
- **Location:** `repos/Atomizer/projects/gigabit-m1-frame-stiffness/` - **Location:** `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/`
- **PKM:** `obsidian-vault/2-Projects/P04-GigaBIT-M1/` - **PKM:** `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/`
- **Owner:** Antoine (direct) - **Owner:** Antoine (direct)
### ✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction) ### ✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction)
@@ -34,7 +34,7 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11)
- **Phase:** Review complete, awaiting CEO decision - **Phase:** Review complete, awaiting CEO decision
- **Status:** 🟡 AWAITING APPROVAL - **Status:** 🟡 AWAITING APPROVAL
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis - **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
- **Location:** `shared/standardization/` - **Location:** `/home/papa/atomizer/workspaces/shared/standardization/`
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide. - **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- **Owner:** Manager - **Owner:** Manager
@@ -42,7 +42,7 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11)
- **Phase:** Technical spec locked, reviews complete - **Phase:** Technical spec locked, reviews complete
- **Status:** 🟡 AWAITING CEO REVIEW - **Status:** 🟡 AWAITING CEO REVIEW
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review - **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
- **Location:** `shared/war-room-isogrid/` - **Location:** `/home/papa/atomizer/workspaces/shared/war-room-isogrid/`
- **Next:** CEO review → implementation planning - **Next:** CEO review → implementation planning
- **Owner:** Manager / Tech Lead - **Owner:** Manager / Tech Lead